ENORMOUS BUILDINGS

Snags pinned on the drawing, defects tracked, and the handover pack assembled as you build.

Snags and defects

Snag lists before handover, defects after it.

Snags are items to fix before handover. Defects are reported during the defects period. Practical completion cannot be certified with critical snags open, and retention is not released until defects are closed.

OpenFixedVerifiedDisputed

Handover pack

As-builts, manuals, warranties and certificates, gathered as you go.

Everything the owner needs to run the building. Missing items are flagged weeks before completion, not on the last day.

RequiredReceivedApproved

Maintenance

Planned maintenance for the building after handover.

Owners get reminders for routine maintenance such as gutter cleaning or pump servicing. Reactive requests go back to the original contractor.

ScheduledDueDone

Completion certificates

Practical, sectional and final completion, and the occupation certificate.

Practical completion is when the building can be used for its purpose, with only minor snags left. It starts the defects period and usually releases half the retention. It cannot be certified while critical or high-priority snags are open.

DraftRequestedCertified

These screens read quantities and rates straight from your BoQ, so every figure here traces back to the drawing it was measured from.

How the whole platform fits together
Bill of quantitiesUSD
  • Excavate foundation trench1,91742.6 m³
  • Concrete strip footing, 25 MPa3,31218.4 m³
  • Common brick, 230 mm wall8,904212 m²
  • Roof trusses, treated pine6,4801 item
Total24,744

Pick the features you need.

Four questions to set up, a sample project to try every screen, and only the features you choose in your menu.

Get your bills of quantities free

Upload a floor plan and get a priced BoQ in minutes, in your country's format and currency. No card needed to start.