ENORMOUS BUILDINGS

Risk assessments drafted for you, permits to work, incident reports with the regulator's deadline.

Risk assessments

Risk assessments and method statements, signed before work starts.

RAMS describe the hazards of an activity, the controls in place and the safe sequence of work. Workers acknowledge them before starting.

Incidents

Report an incident or near miss in under a minute.

Report what happened, where and who was involved. The classification sets the investigation steps and whether the regulator must be told, and by when.

Permits to work

Hot works, heights, confined spaces: issued, timed and closed.

A permit to work authorises a high-risk task for a set time. It can only be issued to people holding the right certificates and must be closed when the work ends.

Inductions and certificates

Who is inducted and whose certificates are about to expire.

Every worker completes the site induction before their first clock-in. Certificates such as first aid or scaffolding have expiry dates and reminders.

Toolbox talks

Short safety talks with attendance on record.

A toolbox talk is a 10-minute safety briefing before work, usually on this week's risks. Recording attendance proves the briefing happened.

PPE issue log

Who was given which protective equipment, and when to replace it.

Record every hard hat, boots, gloves, harness or respirator issued, with the date it should be replaced. It proves workers were equipped if there is ever an incident.

Safety audits

Scored site safety checks, with the trend over time.

Walk the site with the checklist and score each area. Anything below standard becomes a task. Scores over time show whether the site is getting safer.

Environment log

Waste, spills, dust, noise, water and fuel on site.

Record waste removed (with the transfer note), spills and how they were cleaned, dust or noise complaints, and water and fuel used. Many permits and green-building ratings ask for this.

These screens read quantities and rates straight from your BoQ, so every figure here traces back to the drawing it was measured from.

How the whole platform fits together
Bill of quantitiesUSD
  • Excavate foundation trench1,91742.6 m³
  • Concrete strip footing, 25 MPa3,31218.4 m³
  • Common brick, 230 mm wall8,904212 m²
  • Roof trusses, treated pine6,4801 item
Total24,744

Pick the features you need.

Four questions to set up, a sample project to try every screen, and only the features you choose in your menu.

Get your bills of quantities free

Upload a floor plan and get a priced BoQ in minutes, in your country's format and currency. No card needed to start.