🇾🇪 Yemen · Construction cost guide · Updated 2026

How much does it cost to build a hotel in Yemen?

Building a hotel in Yemen typically costs $4,280,000 to $8,570,000 in construction cost — roughly $428–$857 per m² ($40–$80 per ft²) over 10,000 m² (107,639 ft²) of floor area. That excludes land, professional fees and statutory charges.

Yemen is one of the lower-cost construction markets in the world — it ranks 192 of 200 countries on our construction cost index, at about 24% of United States build costs. This page prices a hotel — roughly 50 keys over four floors, RC frame, lift, kitchen, back-of-house and restaurant — at 10000 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Yemen is YER (﷼), and a bill of quantities generated from your own drawings is priced in YER using the POMI standard.

Generate a bill of quantitiesFree preview · Priced in YER
Advertisement
Total construction cost
$4,280,000 – $8,570,000
Cost per m²
$428–$857/m² ($40–$80/ft²)
Gross floor area
10,000 m² (107,639 ft²) · 4 storeys

What is being priced

The figures on this page price a hotel in Yemen at 10,000 m² (107,639 ft²) of gross floor area over 4 storeys, specified as roughly 50 keys over four floors, RC frame, lift, kitchen, back-of-house and restaurant. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$3,081,600 – $6,170,400
Standard finish$4,280,000 – $8,570,000
Premium finish$6,206,000 – $12,426,500
Advertisement

Where the money goes

Elemental split of construction cost for a hotel of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure
Excavation, foundations and ground-floor slab.
12%$513,600 – $1,028,400
Structural frame & upper floors
Columns, beams, suspended slabs, stairs and cores.
24%$1,027,200 – $2,056,800
Envelope — walls, windows & roof
External walling, glazing, roof covering and waterproofing.
19%$813,200 – $1,628,300
Internal finishes & partitions
Partitions, plaster, screeds, floor and ceiling finishes, painting.
17%$727,600 – $1,456,900
Services (MEP)
Electrical, plumbing, drainage, HVAC and lifts — the biggest single risk on framed buildings.
21%$898,800 – $1,799,700
External works & preliminaries
Site setup, supervision, paving, boundary and drainage outside the footprint.
7%$299,600 – $599,900

No drawings needed

Get a priced bill of quantities for your own house

The figures above are benchmarks for Yemen. Tell us how big your build is and get the itemised version — every material and trade measured and priced in YER, — without needing architectural drawings.

Advertisement

Building hotels in Yemen — frequently asked

How much does it cost to build a hotel in Yemen?

+

Building a hotel in Yemen typically costs $4,280,000 to $8,570,000 in construction cost — roughly $428–$857 per m² ($40–$80 per ft²) over 10,000 m² (107,639 ft²) of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $3,081,600–$6,170,400; at a premium specification, $6,206,000–$12,426,500.

What is the cost per square metre in Yemen?

+

About $428–$857 per m² ($40–$80 per ft²) for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Structural frame & upper floors — about 24% of construction cost, or $1,027,200–$2,056,800 on this build. Columns, beams, suspended slabs, stairs and cores.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in Yemen?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in YER in the POMI format that Yemen quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Yemen sits at index 24 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.

Other build costs in Yemen

For contractors & quantity surveyors

Tendering in Yemen every month?

A one-off bill suits a single project. If you tender regularly, a monthly plan brings the cost of each bill right down, with no card to re-enter each time.

Get started freeCompare the options once you're in · cancel any time
Keep exploring
Advertisement

Get your bills of quantities free

Upload a floor plan and get a priced BoQ in minutes, in your country's format and currency. No card needed to start.