🇾🇪

POMI — Principles of Measurement International (RICS)

Bills of Quantities for Yemen, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Yemen — using the POMI — Principles of Measurement International (RICS) standard that local quantity surveyors, contractors and lenders expect, priced in YER (﷼), with every rate source-cited.

Generate a Yemen BoQPriced in YER () · Free preview, pay 1% to unlock
Measurement standard
POMI
Document
Bill of Quantities (BoQ)
Currency
YER (﷼)

What your Yemen BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in YER when you generate your own BoQ.

How it works in Yemen

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Yemen & YER
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced POMI bill in minutes, ready to download.

Yemen — frequently asked

What BoQ format is used in Yemen?+

Yemen uses the POMI — Principles of Measurement International (RICS) standard. Your bill is generated in that exact format, priced in YER.

What currency is my BoQ priced in?+

Every rate and total is priced in YER (﷼), the currency used in Yemen. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Yemen project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Yemen QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Yemen build?

Generate a Yemen BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in YER
Related