🇵🇰 Pakistan · Construction cost guide · Updated 2026

How much does it cost to build a garage in Pakistan?

Building a garage in Pakistan typically costs $10,080 to $18,720 in construction cost — roughly $280–$520 per square metre over 36 m² of floor area. That excludes land, professional fees and statutory charges.

Pakistan is one of the lower-cost construction markets in the world — it ranks 200 of 200 countries on our construction cost index, at about 20% of United States build costs. This page prices a garage — double garage, masonry walls, concrete slab, roller door, unheated — at 36 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Pakistan is PKR (₨), and a bill of quantities generated from your own drawings is priced in PKR using the MES SMM / Composite Schedule of Rates practice standard.

Advertisement
Total construction cost
$10,080 – $18,720
Cost per m²
$280 – $520
Gross floor area
36 m² · 1 storey

What is being priced

The figures on this page price a garage in Pakistan at 36 m² of gross floor area over 1 storey, specified as double garage, masonry walls, concrete slab, roller door, unheated. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$7,258$13,478
Standard finish$10,080$18,720
Premium finish$14,616$27,144
Advertisement

Where the money goes

Elemental split of construction cost for a garage of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure & foundations
Excavation, strip footings, hardcore, blinding, DPC and ground slab.
15%$1,512$2,808
Walling & superstructure
Masonry, lintels, ring beam and any suspended floor.
22%$2,218$4,118
Roofing
Trusses or rafters, covering, ceilings, fascia and rainwater goods.
14%$1,411$2,621
Internal finishes
Plaster, screed, floor and wall tiling, ceilings and painting.
18%$1,814$3,370
Joinery & fittings
Doors, windows, cupboards, worktops and ironmongery.
9%$907$1,685
Services (plumbing & electrical)
Wiring, distribution board, fittings, water reticulation, sanitaryware and drainage.
14%$1,411$2,621
External works & preliminaries
Site setup, supervision, paths, boundary works and connections.
8%$806$1,498

Get the real number for your own plans

A benchmark tells you the ballpark. Upload your dimensioned drawings and get an itemised, source-cited bill of quantities priced in PKR (), measured to the MES SMM / Composite Schedule of Rates practice standard Pakistan professionals use.

Price my Pakistan project
Advertisement

Building garages in Pakistan — frequently asked

How much does it cost to build a garage in Pakistan?

+

Building a garage in Pakistan typically costs $10,080 to $18,720 in construction cost — roughly $280–$520 per square metre over 36 m² of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $7,258–$13,478; at a premium specification, $14,616–$27,144.

What is the cost per square metre in Pakistan?

+

About $280–$520 per m² for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Walling & superstructure — about 22% of construction cost, or $2,218–$4,118 on this build. Masonry, lintels, ring beam and any suspended floor.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in Pakistan?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in PKR in the MES SMM / Composite Schedule of Rates practice format that Pakistan quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Pakistan sits at index 20 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.

Other build costs in Pakistan

Keep exploring
Advertisement