🇵🇰

MES SMM / Composite Schedule of Rates practice (Pakistan)

Bills of Quantities for Pakistan, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Pakistan — using the MES SMM / Composite Schedule of Rates practice (Pakistan) standard that local quantity surveyors, contractors and lenders expect, priced in PKR (₨), with every rate source-cited.

Generate a Pakistan BoQPriced in PKR () · Free preview, pay 1% to unlock
Measurement standard
MES SMM / Composite Schedule of Rates practice (Pakistan)
Document
Bill of Quantities (BoQ)
Currency
PKR (₨)

What your Pakistan BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in PKR when you generate your own BoQ.

How it works in Pakistan

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Pakistan & PKR
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced MES SMM / Composite Schedule of Rates practice (Pakistan) bill in minutes, ready to download.

Pakistan — frequently asked

What BoQ format is used in Pakistan?+

Pakistan uses the MES SMM / Composite Schedule of Rates practice (Pakistan) standard. Your bill is generated in that exact format, priced in PKR.

What currency is my BoQ priced in?+

Every rate and total is priced in PKR (₨), the currency used in Pakistan. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Pakistan project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Pakistan QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Pakistan build?

Generate a Pakistan BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in PKR
Related