How much does it cost to build a two-storey house in Timor-Leste?

Building a two-storey house in Timor-Leste typically costs $206,800 to $384,560 in construction cost — roughly $470–$874 per square metre over 440 m² of floor area. That excludes land, professional fees and statutory charges.

Timor-Leste is one of the lower-cost construction markets in the world — it ranks 137 of 200 countries on our construction cost index, at about 32% of United States build costs. This page prices a two-storey house — two floors over a strip foundation, suspended reinforced-concrete first floor, internal staircase — at 440 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Timor-Leste is USD ($), and a bill of quantities generated from your own drawings is priced in USD using the Mapa de Quantidades standard.

Advertisement
Total construction cost
$206,800 – $384,560
Cost per m²
$470 – $874
Gross floor area
440 m² · 2 storeys

What is being priced

The figures on this page price a two-storey house in Timor-Leste at 440 m² of gross floor area over 2 storeys, specified as two floors over a strip foundation, suspended reinforced-concrete first floor, internal staircase. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$148,896$276,883
Standard finish$206,800$384,560
Premium finish$299,860$557,612
Advertisement

Where the money goes

Elemental split of construction cost for a two-storey house of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure & foundations
Excavation, strip footings, hardcore, blinding, DPC and ground slab.
15%$31,020$57,684
Walling & superstructure
Masonry, lintels, ring beam and any suspended floor.
22%$45,496$84,603
Roofing
Trusses or rafters, covering, ceilings, fascia and rainwater goods.
14%$28,952$53,838
Internal finishes
Plaster, screed, floor and wall tiling, ceilings and painting.
18%$37,224$69,221
Joinery & fittings
Doors, windows, cupboards, worktops and ironmongery.
9%$18,612$34,610
Services (plumbing & electrical)
Wiring, distribution board, fittings, water reticulation, sanitaryware and drainage.
14%$28,952$53,838
External works & preliminaries
Site setup, supervision, paths, boundary works and connections.
8%$16,544$30,765

Get the real number for your own plans

A benchmark tells you the ballpark. Upload your dimensioned drawings and get an itemised, source-cited bill of quantities priced in USD ($), measured to the Mapa de Quantidades standard Timor-Leste professionals use.

Price my Timor-Leste project
Advertisement

Building two-storey houses in Timor-Leste — frequently asked

How much does it cost to build a two-storey house in Timor-Leste?

+

Building a two-storey house in Timor-Leste typically costs $206,800 to $384,560 in construction cost — roughly $470–$874 per square metre over 440 m² of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $148,896–$276,883; at a premium specification, $299,860–$557,612.

What is the cost per square metre in Timor-Leste?

+

About $470–$874 per m² for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Walling & superstructure — about 22% of construction cost, or $45,496–$84,603 on this build. Masonry, lintels, ring beam and any suspended floor.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in Timor-Leste?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in USD in the Mapa de Quantidades format that Timor-Leste quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Timor-Leste sits at index 32 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.

Other build costs in Timor-Leste

Keep exploring
Advertisement