🇹🇱

Mapa de Quantidades (Portuguese-language practice)

Bills of Quantities for Timor-Leste, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (Mapa de Quantidades) (Mapa de Quantidades / Mapa de Medições) for Timor-Leste — using the Mapa de Quantidades (Portuguese-language practice) standard that local quantity surveyors, contractors and lenders expect, priced in USD ($), with every rate source-cited.

Generate a Timor-Leste BoQPriced in USD ($) · Free preview, pay 1% to unlock
Measurement standard
Mapa de Quantidades (Portuguese-language practice)
Document
Mapa de Quantidades / Mapa de Medições
Currency
USD ($)

What your Timor-Leste BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in USD when you generate your own BoQ.

How it works in Timor-Leste

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Timor-Leste & USD
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced Mapa de Quantidades (Portuguese-language practice) bill in minutes, ready to download.

Timor-Leste — frequently asked

What BoQ format is used in Timor-Leste?+

Timor-Leste uses the Mapa de Quantidades (Portuguese-language practice) standard. Your bill is generated in that exact format (locally known as the Mapa de Quantidades / Mapa de Medições), priced in USD.

What currency is my BoQ priced in?+

Every rate and total is priced in USD ($), the currency used in Timor-Leste. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (Mapa de Quantidades) (Mapa de Quantidades / Mapa de Medições) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Timor-Leste project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Timor-Leste QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Timor-Leste build?

Generate a Timor-Leste BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in USD
Related