🇳🇵 Nepal · Construction cost guide · Updated 2026

How much does it cost to build a clinic in Nepal?

Building a clinic in Nepal typically costs $112,200 to $224,400 in construction cost — roughly $374–$748 per square metre over 300 m² of floor area. That excludes land, professional fees and statutory charges.

Nepal is one of the lower-cost construction markets in the world — it ranks 198 of 200 countries on our construction cost index, at about 22% of United States build costs. This page prices a clinic — primary-care clinic: consulting rooms, treatment room, waiting area, dispensary, ablutions — at 300 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Nepal is NPR (₨), and a bill of quantities generated from your own drawings is priced in NPR using the IS 1200 standard.

Advertisement
Total construction cost
$112,200 – $224,400
Cost per m²
$374 – $748
Gross floor area
300 m² · 1 storey

What is being priced

The figures on this page price a clinic in Nepal at 300 m² of gross floor area over 1 storey, specified as primary-care clinic: consulting rooms, treatment room, waiting area, dispensary, ablutions. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$80,784$161,568
Standard finish$112,200$224,400
Premium finish$162,690$325,380
Advertisement

Where the money goes

Elemental split of construction cost for a clinic of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure & foundations
Excavation, strip footings, hardcore, blinding, DPC and ground slab.
15%$16,830$33,660
Walling & superstructure
Masonry, lintels, ring beam and any suspended floor.
22%$24,684$49,368
Roofing
Trusses or rafters, covering, ceilings, fascia and rainwater goods.
14%$15,708$31,416
Internal finishes
Plaster, screed, floor and wall tiling, ceilings and painting.
18%$20,196$40,392
Joinery & fittings
Doors, windows, cupboards, worktops and ironmongery.
9%$10,098$20,196
Services (plumbing & electrical)
Wiring, distribution board, fittings, water reticulation, sanitaryware and drainage.
14%$15,708$31,416
External works & preliminaries
Site setup, supervision, paths, boundary works and connections.
8%$8,976$17,952

Get the real number for your own plans

A benchmark tells you the ballpark. Upload your dimensioned drawings and get an itemised, source-cited bill of quantities priced in NPR (), measured to the IS 1200 standard Nepal professionals use.

Price my Nepal project
Advertisement

Building clinics in Nepal — frequently asked

How much does it cost to build a clinic in Nepal?

+

Building a clinic in Nepal typically costs $112,200 to $224,400 in construction cost — roughly $374–$748 per square metre over 300 m² of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $80,784–$161,568; at a premium specification, $162,690–$325,380.

What is the cost per square metre in Nepal?

+

About $374–$748 per m² for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Walling & superstructure — about 22% of construction cost, or $24,684–$49,368 on this build. Masonry, lintels, ring beam and any suspended floor.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in Nepal?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in NPR in the IS 1200 format that Nepal quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Nepal sits at index 22 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.

Other build costs in Nepal

Keep exploring
Advertisement