🇳🇵

IS 1200 — Method of Measurement of Building Works (India)

Bills of Quantities for Nepal, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Nepal — using the IS 1200 — Method of Measurement of Building Works (India) standard that local quantity surveyors, contractors and lenders expect, priced in NPR (₨), with every rate source-cited.

Generate a Nepal BoQPriced in NPR () · Free preview, pay 1% to unlock
Measurement standard
IS 1200
Document
Bill of Quantities (BoQ)
Currency
NPR (₨)

What your Nepal BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in NPR when you generate your own BoQ.

How it works in Nepal

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Nepal & NPR
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced IS 1200 bill in minutes, ready to download.

Nepal — frequently asked

What BoQ format is used in Nepal?+

Nepal uses the IS 1200 — Method of Measurement of Building Works (India) standard. Your bill is generated in that exact format, priced in NPR.

What currency is my BoQ priced in?+

Every rate and total is priced in NPR (₨), the currency used in Nepal. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Nepal project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Nepal QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Nepal build?

Generate a Nepal BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in NPR
Related