🇦🇺 Australia · Construction cost guide · Updated 2026

How much does it cost to build a two-storey house in Australia?

Building a two-storey house in Australia typically costs $698,720 to $1,297,120 in construction cost — roughly $1,588–$2,948 per m² ($148–$274 per ft²) over 440 m² (4,736 ft²) of floor area. That excludes land, professional fees and statutory charges.

Australia is a high-cost construction market by global standards — it ranks 16 of 200 countries on our construction cost index, at about 108% of United States build costs. This page prices a two-storey house — two floors over a strip foundation, suspended reinforced-concrete first floor, internal staircase — at 440 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Australia is AUD (A$), and a bill of quantities generated from your own drawings is priced in AUD using the ASMM6 standard.

Generate a bill of quantitiesFree preview · Priced in AUD
Advertisement
Total construction cost
$698,720 – $1,297,120
Cost per m²
$1,588–$2,948/m² ($148–$274/ft²)
Gross floor area
440 m² (4,736 ft²) · 2 storeys

What is being priced

The figures on this page price a two-storey house in Australia at 440 m² (4,736 ft²) of gross floor area over 2 storeys, specified as two floors over a strip foundation, suspended reinforced-concrete first floor, internal staircase. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$503,078 – $933,926
Standard finish$698,720 – $1,297,120
Premium finish$1,013,144 – $1,880,824
Advertisement

Where the money goes

Elemental split of construction cost for a two-storey house of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure & foundations
Excavation, strip footings, hardcore, blinding, DPC and ground slab.
15%$104,808 – $194,568
Walling & superstructure
Masonry, lintels, ring beam and any suspended floor.
22%$153,718 – $285,366
Roofing
Trusses or rafters, covering, ceilings, fascia and rainwater goods.
14%$97,821 – $181,597
Internal finishes
Plaster, screed, floor and wall tiling, ceilings and painting.
18%$125,770 – $233,482
Joinery & fittings
Doors, windows, cupboards, worktops and ironmongery.
9%$62,885 – $116,741
Services (plumbing & electrical)
Wiring, distribution board, fittings, water reticulation, sanitaryware and drainage.
14%$97,821 – $181,597
External works & preliminaries
Site setup, supervision, paths, boundary works and connections.
8%$55,898 – $103,770

No drawings needed

Get a priced bill of quantities for your own house

The figures above are benchmarks for Australia. Tell us how big your build is and get the itemised version — every material and trade measured and priced in AUD, — without needing architectural drawings.

Advertisement

Building two-storey houses in Australia — frequently asked

How much does it cost to build a two-storey house in Australia?

+

Building a two-storey house in Australia typically costs $698,720 to $1,297,120 in construction cost — roughly $1,588–$2,948 per m² ($148–$274 per ft²) over 440 m² (4,736 ft²) of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $503,078–$933,926; at a premium specification, $1,013,144–$1,880,824.

What is the cost per square metre in Australia?

+

About $1,588–$2,948 per m² ($148–$274 per ft²) for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Walling & superstructure — about 22% of construction cost, or $153,718–$285,366 on this build. Masonry, lintels, ring beam and any suspended floor.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in Australia?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in AUD in the ASMM6 format that Australia quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Australia sits at index 108 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.

Other build costs in Australia

For contractors & quantity surveyors

Tendering in Australia every month?

A one-off bill suits a single project. If you tender regularly, a monthly plan brings the cost of each bill right down, with no card to re-enter each time.

Get started freeCompare the options once you're in · cancel any time
Keep exploring
Advertisement

Get your bills of quantities free

Upload a floor plan and get a priced BoQ in minutes, in your country's format and currency. No card needed to start.