🇹🇱 Timor-Leste · Cement · Updated 2026

How much cement do you need to build a house in Timor-Leste?

A 150 m² single-storey house in Timor-Leste needs roughly 313 bags (50 kg) of cement — about 2.09 bags (50 kg) per m² of floor area. That is computed from Timor-Leste construction conventions: 1:5 mortar, 1:2:4 concrete, and 12 mm internal plaster, including the local wastage allowance.

Cement quantities for a house in Timor-Leste, computed from how buildings are actually put up here rather than from a global average. The tables below run from a small 50 m² dwelling to a 400 m² family home, and the method section shows how to reproduce every figure by hand so you can adapt it to your own plan.

Advertisement

Cement by house size in Timor-Leste

Floor areaCement requiredPer m² of floor
50 m²128 bags (50 kg)2.56
75 m²177 bags (50 kg)2.36
100 m²224 bags (50 kg)2.24
150 m²313 bags (50 kg)2.09
200 m²398 bags (50 kg)1.99
250 m²486 bags (50 kg)1.94
300 m²568 bags (50 kg)1.89
400 m²733 bags (50 kg)1.83

Single-storey. The per-m² rate falls as the house grows — a small house has more wall and roof per square metre of floor than a large one, which is why these are computed size by size rather than scaled from a single rate.

Where it goes — 150 m² house

Mortar cement
5 m³ mortar at 1:5
32 bags (50 kg)
Cement — general concrete
Footings and blinding, 12 m³
76 bags (50 kg)
Cement — structural concrete
Slabs, 15 m³ at 1:1.5:3
121 bags (50 kg)
Cement — plaster
15 mm external, 12 mm internal, 1:5
38 bags (50 kg)
Floor screed cement
40 mm screed at 1:4
46 bags (50 kg)
Advertisement

What drives the quantity in Timor-Leste

FactorLocal valueEffect
Mortar mix1:5A richer mortar burns cement fast — going from 1:6 to 1:4 raises the mortar cement bill by roughly half.
General concrete mix1:2:4Footings and blinding. The leanest mix on the job and usually the largest concrete volume.
Structural concrete mix1:1.5:3Slabs, beams and columns. Richer, and non-negotiable — this is the mix an engineer specifies.
Plaster mix1:5Applied 15 mm externally and 12 mm internally here.
Screed mix1:4At 40 mm thick over the whole floor area.

How to calculate it yourself

  1. 01

    Work out each wet volume first: mortar, concrete, plaster and screed are all calculated separately because they use different mixes.

  2. 02

    Multiply the wet volume by the dry factor — 1.54 for concrete, 1.33 for mortar and plaster — because dry materials lose volume once mixed and compacted.

  3. 03

    Split the dry volume by the mix parts. For a 1:2:4 concrete that is 1 part in 7.

  4. 04

    Convert the cement volume to mass at about 1,440 kg/m³, then divide by 50 to get bags.

  5. 05

    Round up per delivery, never per calculation — part bags left open on site go hard and are wasted.

Advertisement

Buying and site notes

  • —Cement has a shelf life. Bags stored more than about three months, or anywhere damp, lose strength — order to the pour, not to the whole job.
  • —Stack bags off the ground on timber and no more than eight high, or the bottom bags compact into unusable lumps.
  • —Buy from one manufacturer for the whole structure where you can: strength classes vary between brands and mixing them makes results inconsistent.

Get every material measured off your own plan

This page works from a representative footprint. Upload your dimensioned drawings and get the full schedule — every material, measured from your real geometry and priced in USD ($).

Take off my drawings

Cement in Timor-Leste — frequently asked

How much cement does a house need in Timor-Leste?

+

A 150 m² single-storey house in Timor-Leste needs roughly 313 bags (50 kg) of cement — about 2.09 bags (50 kg) per m² of floor area. That is computed from Timor-Leste construction conventions: 1:5 mortar, 1:2:4 concrete, and 12 mm internal plaster, including the local wastage allowance.

How much cement per square metre in Timor-Leste?

+

About 2.09 bags (50 kg) per m² of floor area for a single-storey house. The figure is not linear across sizes — a small house has proportionally more wall and roof per m² of floor than a large one, which is why the table above is computed size by size rather than scaled from one rate.

What changes the quantity of cement needed?

+

Mortar mix (1:5) — A richer mortar burns cement fast — going from 1:6 to 1:4 raises the mortar cement bill by roughly half. General concrete mix (1:2:4) — Footings and blinding. The leanest mix on the job and usually the largest concrete volume. Structural concrete mix (1:1.5:3) — Slabs, beams and columns. Richer, and non-negotiable — this is the mix an engineer specifies.

Is wastage included?

+

Where it applies, yes — a 5% allowance is carried on the perishable materials (walling units, tiles, paint). Bulk materials like sand and stone carry handling loss instead. Ordering the theoretical quantity with no allowance reliably means a second delivery at a worse price.

How accurate is this for my own house?

+

It is a planning quantity derived from a representative rectangular footprint, so it is the right order of magnitude and internally consistent — good for budgeting and for checking a supplier's list. It is not a measured takeoff of your plan. Upload your dimensioned drawings to get quantities measured off your real geometry and priced in USD.

Are cement prices included?

+

No, deliberately. Material prices in Timor-Leste move week to week and vary by region, so a price printed on a static page would be wrong within a month. This page gives you the quantity — take that to two or three local suppliers and the price will be current and competitive.

Other materials for a 150 m² house in Timor-Leste

Keep exploring
Advertisement

Get your bills of quantities free

Upload a floor plan and get a priced BoQ in minutes, in your country's format and currency. No card needed to start.