DQE / DPGF (French practice)
Bills of Quantities for Democratic Republic of the Congo, done in minutes
Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (Devis Quantitatif Estimatif) (Devis Quantitatif Estimatif (DQE) / DPGF) for Democratic Republic of the Congo — using the DQE / DPGF (French practice) standard that local quantity surveyors, contractors and lenders expect, priced in CDF (FC), with every rate source-cited.
What your Democratic Republic of the Congo BoQ includes
- Preliminaries
- Substructure & foundations
- Superstructure & walling
- Roofing
- Internal finishes
- Services (plumbing & electrical)
- External works
| Description | Unit | Qty |
|---|---|---|
| Foundation trench excavation | m³ | 22.0 |
| Mass concrete strip foundation, C20 | m | 46.0 |
| 230mm masonry walls, common bond | m² | 168.0 |
| Reinforced concrete lintels over openings | m | 24.0 |
| Roof trusses & covering | m² | 142.0 |
| Internal plaster & finishes | m² | 380.0 |
Rates and totals are priced in CDF when you generate your own BoQ.
How it works in Democratic Republic of the Congo
Democratic Republic of the Congo — frequently asked
What BoQ format is used in Democratic Republic of the Congo?+
Democratic Republic of the Congo uses the DQE / DPGF (French practice) standard. Your bill is generated in that exact format (locally known as the Devis Quantitatif Estimatif (DQE) / DPGF), priced in CDF.
What currency is my BoQ priced in?+
Every rate and total is priced in CDF (FC), the currency used in Democratic Republic of the Congo. You can also choose any other currency at generation.
How much does it cost?+
Generating and previewing is free. Unlocking the full Bill of Quantities (Devis Quantitatif Estimatif) (Devis Quantitatif Estimatif (DQE) / DPGF) costs 1% of the estimated building cost, paid in your own currency.
How long does it take?+
A typical analysis for a Democratic Republic of the Congo project completes in a few minutes — versus the days or weeks a manual takeoff takes.
Can a quantity surveyor or contractor rely on it?+
The bill is grouped by trade and every unit rate carries a source, so a Democratic Republic of the Congo QS or contractor can check each figure. Treat it as a fast, auditable first-pass.