🇧🇹

IS 1200 — Method of Measurement of Building Works (India)

Bills of Quantities for Bhutan, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Bhutan — using the IS 1200 — Method of Measurement of Building Works (India) standard that local quantity surveyors, contractors and lenders expect, priced in BTN (Nu.), with every rate source-cited.

Generate a Bhutan BoQPriced in BTN (Nu.) · Free preview, pay 1% to unlock
Measurement standard
IS 1200
Document
Bill of Quantities (BoQ)
Currency
BTN (Nu.)

What your Bhutan BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in BTN when you generate your own BoQ.

How it works in Bhutan

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Bhutan & BTN
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced IS 1200 bill in minutes, ready to download.

Bhutan — frequently asked

What BoQ format is used in Bhutan?+

Bhutan uses the IS 1200 — Method of Measurement of Building Works (India) standard. Your bill is generated in that exact format, priced in BTN.

What currency is my BoQ priced in?+

Every rate and total is priced in BTN (Nu.), the currency used in Bhutan. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Bhutan project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Bhutan QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Bhutan build?

Generate a Bhutan BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in BTN
Related