How much does it cost to build a two-storey house in Taiwan?

Building a two-storey house in Taiwan typically costs $465,520 to $865,040 in construction cost — roughly $1,058–$1,966 per square metre over 440 m² of floor area. That excludes land, professional fees and statutory charges.

Taiwan is an upper-middle-cost construction market — it ranks 38 of 200 countries on our construction cost index, at about 72% of United States build costs. This page prices a two-storey house — two floors over a strip foundation, suspended reinforced-concrete first floor, internal staircase — at 440 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Taiwan is TWD (NT$), and a bill of quantities generated from your own drawings is priced in TWD using the PCCES schedule practice standard.

Advertisement
Total construction cost
$465,520 – $865,040
Cost per m²
$1,058 – $1,966
Gross floor area
440 m² · 2 storeys

What is being priced

The figures on this page price a two-storey house in Taiwan at 440 m² of gross floor area over 2 storeys, specified as two floors over a strip foundation, suspended reinforced-concrete first floor, internal staircase. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$335,174$622,829
Standard finish$465,520$865,040
Premium finish$675,004$1,254,308
Advertisement

Where the money goes

Elemental split of construction cost for a two-storey house of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure & foundations
Excavation, strip footings, hardcore, blinding, DPC and ground slab.
15%$69,828$129,756
Walling & superstructure
Masonry, lintels, ring beam and any suspended floor.
22%$102,414$190,309
Roofing
Trusses or rafters, covering, ceilings, fascia and rainwater goods.
14%$65,173$121,106
Internal finishes
Plaster, screed, floor and wall tiling, ceilings and painting.
18%$83,794$155,707
Joinery & fittings
Doors, windows, cupboards, worktops and ironmongery.
9%$41,897$77,854
Services (plumbing & electrical)
Wiring, distribution board, fittings, water reticulation, sanitaryware and drainage.
14%$65,173$121,106
External works & preliminaries
Site setup, supervision, paths, boundary works and connections.
8%$37,242$69,203

Get the real number for your own plans

A benchmark tells you the ballpark. Upload your dimensioned drawings and get an itemised, source-cited bill of quantities priced in TWD (NT$), measured to the PCCES schedule practice standard Taiwan professionals use.

Price my Taiwan project
Advertisement

Building two-storey houses in Taiwan — frequently asked

How much does it cost to build a two-storey house in Taiwan?

+

Building a two-storey house in Taiwan typically costs $465,520 to $865,040 in construction cost — roughly $1,058–$1,966 per square metre over 440 m² of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $335,174–$622,829; at a premium specification, $675,004–$1,254,308.

What is the cost per square metre in Taiwan?

+

About $1,058–$1,966 per m² for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Walling & superstructure — about 22% of construction cost, or $102,414–$190,309 on this build. Masonry, lintels, ring beam and any suspended floor.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in Taiwan?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in TWD in the PCCES schedule practice format that Taiwan quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Taiwan sits at index 72 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.