How much does it cost to build a swimming pool in Sudan?

Building a swimming pool in Sudan typically costs $10,752 to $19,968 in construction cost — roughly $336–$624 per square metre over 32 m² of floor area. That excludes land, professional fees and statutory charges.

Sudan is one of the lower-cost construction markets in the world — it ranks 187 of 200 countries on our construction cost index, at about 24% of United States build costs. This page prices a swimming pool — 8 m × 4 m reinforced-concrete pool with plant room, filtration, paving surround — at 32 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Sudan is SDG (ج.س.), and a bill of quantities generated from your own drawings is priced in SDG using the SMM7 standard.

Advertisement
Total construction cost
$10,752 – $19,968
Cost per m²
$336 – $624
Gross floor area
32 m² · 1 storey

What is being priced

The figures on this page price a swimming pool in Sudan at 32 m² of gross floor area over 1 storey, specified as 8 m × 4 m reinforced-concrete pool with plant room, filtration, paving surround. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$7,741$14,377
Standard finish$10,752$19,968
Premium finish$15,590$28,954
Advertisement

Where the money goes

Elemental split of construction cost for a swimming pool of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure
Excavation, foundations and ground-floor slab.
12%$1,290$2,396
Structural frame & upper floors
Columns, beams, suspended slabs, stairs and cores.
24%$2,580$4,792
Envelope — walls, windows & roof
External walling, glazing, roof covering and waterproofing.
19%$2,043$3,794
Internal finishes & partitions
Partitions, plaster, screeds, floor and ceiling finishes, painting.
17%$1,828$3,395
Services (MEP)
Electrical, plumbing, drainage, HVAC and lifts — the biggest single risk on framed buildings.
21%$2,258$4,193
External works & preliminaries
Site setup, supervision, paving, boundary and drainage outside the footprint.
7%$753$1,398

Get the real number for your own plans

A benchmark tells you the ballpark. Upload your dimensioned drawings and get an itemised, source-cited bill of quantities priced in SDG (ج.س.), measured to the SMM7 standard Sudan professionals use.

Price my Sudan project
Advertisement

Building swimming pools in Sudan — frequently asked

How much does it cost to build a swimming pool in Sudan?

+

Building a swimming pool in Sudan typically costs $10,752 to $19,968 in construction cost — roughly $336–$624 per square metre over 32 m² of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $7,741–$14,377; at a premium specification, $15,590–$28,954.

What is the cost per square metre in Sudan?

+

About $336–$624 per m² for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Structural frame & upper floors — about 24% of construction cost, or $2,580–$4,792 on this build. Columns, beams, suspended slabs, stairs and cores.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in Sudan?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in SDG in the SMM7 format that Sudan quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Sudan sits at index 24 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.