🇸🇦 Saudi Arabia · Construction cost guide · Updated 2026

How much does it cost to build a shop in Saudi Arabia?

Building a shop in Saudi Arabia typically costs $122,400 to $244,800 in construction cost — roughly $1,020–$2,040 per m² ($95–$190 per ft²) over 120 m² (1,292 ft²) of floor area. That excludes land, professional fees and statutory charges.

Saudi Arabia is a mid-cost construction market — it ranks 53 of 200 countries on our construction cost index, at about 60% of United States build costs. This page prices a shop — single retail unit with a shopfront, back store, staff WC and basic fit-out — at 120 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Saudi Arabia is SAR (ر.س), and a bill of quantities generated from your own drawings is priced in SAR using the POMI standard.

Generate a bill of quantitiesFree preview · Priced in SAR
Advertisement
Total construction cost
$122,400 – $244,800
Cost per m²
$1,020–$2,040/m² ($95–$190/ft²)
Gross floor area
120 m² (1,292 ft²) · 1 storey

What is being priced

The figures on this page price a shop in Saudi Arabia at 120 m² (1,292 ft²) of gross floor area over 1 storey, specified as single retail unit with a shopfront, back store, staff WC and basic fit-out. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$88,128 – $176,256
Standard finish$122,400 – $244,800
Premium finish$177,480 – $354,960
Advertisement

Where the money goes

Elemental split of construction cost for a shop of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure & foundations
Excavation, strip footings, hardcore, blinding, DPC and ground slab.
15%$18,360 – $36,720
Walling & superstructure
Masonry, lintels, ring beam and any suspended floor.
22%$26,928 – $53,856
Roofing
Trusses or rafters, covering, ceilings, fascia and rainwater goods.
14%$17,136 – $34,272
Internal finishes
Plaster, screed, floor and wall tiling, ceilings and painting.
18%$22,032 – $44,064
Joinery & fittings
Doors, windows, cupboards, worktops and ironmongery.
9%$11,016 – $22,032
Services (plumbing & electrical)
Wiring, distribution board, fittings, water reticulation, sanitaryware and drainage.
14%$17,136 – $34,272
External works & preliminaries
Site setup, supervision, paths, boundary works and connections.
8%$9,792 – $19,584

No drawings needed

Get a priced bill of quantities for your own house

The figures above are benchmarks for Saudi Arabia. Tell us how big your build is and get the itemised version — every material and trade measured and priced in SAR, — without needing architectural drawings.

Advertisement

Building shops in Saudi Arabia — frequently asked

How much does it cost to build a shop in Saudi Arabia?

+

Building a shop in Saudi Arabia typically costs $122,400 to $244,800 in construction cost — roughly $1,020–$2,040 per m² ($95–$190 per ft²) over 120 m² (1,292 ft²) of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $88,128–$176,256; at a premium specification, $177,480–$354,960.

What is the cost per square metre in Saudi Arabia?

+

About $1,020–$2,040 per m² ($95–$190 per ft²) for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Walling & superstructure — about 22% of construction cost, or $26,928–$53,856 on this build. Masonry, lintels, ring beam and any suspended floor.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in Saudi Arabia?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in SAR in the POMI format that Saudi Arabia quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Saudi Arabia sits at index 60 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.

Other build costs in Saudi Arabia

For contractors & quantity surveyors

Tendering in Saudi Arabia every month?

A one-off bill suits a single project. If you tender regularly, a monthly plan brings the cost of each bill right down, with no card to re-enter each time.

Get started freeCompare the options once you're in · cancel any time
Keep exploring
Advertisement

Get your bills of quantities free

Upload a floor plan and get a priced BoQ in minutes, in your country's format and currency. No card needed to start.