🇻🇨 Saint Vincent and the Grenadines · Construction cost guide · Updated 2026

How much does it cost to build a two-storey house in Saint Vincent and the Grenadines?

Building a two-storey house in Saint Vincent and the Grenadines typically costs $362,120 to $672,760 in construction cost — roughly $823–$1,529 per square metre over 440 m² of floor area. That excludes land, professional fees and statutory charges.

Saint Vincent and the Grenadines is a mid-cost construction market — it ranks 65 of 200 countries on our construction cost index, at about 56% of United States build costs. This page prices a two-storey house — two floors over a strip foundation, suspended reinforced-concrete first floor, internal staircase — at 440 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Saint Vincent and the Grenadines is XCD ($), and a bill of quantities generated from your own drawings is priced in XCD using the SMM7 standard.

Advertisement
Total construction cost
$362,120 – $672,760
Cost per m²
$823 – $1,529
Gross floor area
440 m² · 2 storeys

What is being priced

The figures on this page price a two-storey house in Saint Vincent and the Grenadines at 440 m² of gross floor area over 2 storeys, specified as two floors over a strip foundation, suspended reinforced-concrete first floor, internal staircase. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$260,726$484,387
Standard finish$362,120$672,760
Premium finish$525,074$975,502
Advertisement

Where the money goes

Elemental split of construction cost for a two-storey house of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure & foundations
Excavation, strip footings, hardcore, blinding, DPC and ground slab.
15%$54,318$100,914
Walling & superstructure
Masonry, lintels, ring beam and any suspended floor.
22%$79,666$148,007
Roofing
Trusses or rafters, covering, ceilings, fascia and rainwater goods.
14%$50,697$94,186
Internal finishes
Plaster, screed, floor and wall tiling, ceilings and painting.
18%$65,182$121,097
Joinery & fittings
Doors, windows, cupboards, worktops and ironmongery.
9%$32,591$60,548
Services (plumbing & electrical)
Wiring, distribution board, fittings, water reticulation, sanitaryware and drainage.
14%$50,697$94,186
External works & preliminaries
Site setup, supervision, paths, boundary works and connections.
8%$28,970$53,821

Get the real number for your own plans

A benchmark tells you the ballpark. Upload your dimensioned drawings and get an itemised, source-cited bill of quantities priced in XCD ($), measured to the SMM7 standard Saint Vincent and the Grenadines professionals use.

Price my Saint Vincent and the Grenadines project
Advertisement

Building two-storey houses in Saint Vincent and the Grenadines — frequently asked

How much does it cost to build a two-storey house in Saint Vincent and the Grenadines?

+

Building a two-storey house in Saint Vincent and the Grenadines typically costs $362,120 to $672,760 in construction cost — roughly $823–$1,529 per square metre over 440 m² of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $260,726–$484,387; at a premium specification, $525,074–$975,502.

What is the cost per square metre in Saint Vincent and the Grenadines?

+

About $823–$1,529 per m² for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Walling & superstructure — about 22% of construction cost, or $79,666–$148,007 on this build. Masonry, lintels, ring beam and any suspended floor.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in Saint Vincent and the Grenadines?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in XCD in the SMM7 format that Saint Vincent and the Grenadines quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Saint Vincent and the Grenadines sits at index 56 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.

Other build costs in Saint Vincent and the Grenadines

Keep exploring
Advertisement