How much does it cost to build a house in Palestine?

Construction costs in Palestine typically run about $300 to $700 per square metre for a standard-specification home — so the total depends mostly on floor area and finish level. The ranges below are order-of-magnitude benchmarks; for a figure tied to your actual drawings, generate a full measured bill of quantities priced in ILS using the POMI standard.

Price my own plansFree preview · Priced in ILS ()

Typical build cost by house size in Palestine

HomeFloor areaEstimated construction cost (USD)
Small home · 2-bedroom~90$27,000$63,000
Standard family home · 3-bedroom~150$45,000$105,000
Large home · 4-bedroom~240$72,000$168,000

Order-of-magnitude benchmarks at ~$300$700 per m², construction only (excludes land, fees and site-specific works). For a figure tied to your actual drawings, generate a measured BoQ.

Get the real number for your build

Benchmarks tell you the ballpark. Upload your plans and get an itemised, priced bill of quantities in ILS, in the POMI format Palestine professionals use.

Generate my Palestine BoQ

Building costs in Palestine — frequently asked

How much does it cost to build a house in Palestine?+

As a benchmark, standard-specification construction in Palestine runs about $300–$700 per m². A 3-bedroom home of ~150 m² therefore lands roughly between $45,000 and $105,000, excluding land. Your real figure depends on specification, site conditions and current material prices — a measured BoQ from your drawings is the accurate way to know.

What is the cost per square metre to build in Palestine?+

Around $300–$700 per m² for a standard finish. Luxury finishes push the top end higher; low-cost builds sit below the bottom. These are all-in construction costs, not including land or professional fees.

How do I get an accurate building cost for my own plans in Palestine?+

Upload your dimensioned floor plans to Enormous Buildings. It measures the quantities and prices them in ILS (₪) using the POMI standard that Palestine quantity surveyors and lenders expect — a full bill of quantities in minutes, free to preview.

Does this cost include land, fees and finishes?+

The benchmark covers construction only — materials and labour to build. Land, statutory fees, professional fees and site-specific works are separate. A generated BoQ itemises the construction scope so you can add the rest.