🇵🇼 Palau · Construction cost guide · Updated 2026

How much does it cost to build a school block in Palau?

Building a school block in Palau typically costs $474,300 to $948,600 in construction cost — roughly $1,054–$2,108 per m² ($98–$196 per ft²) over 450 m² (4,844 ft²) of floor area. That excludes land, professional fees and statutory charges.

Palau is a mid-cost construction market — it ranks 52 of 200 countries on our construction cost index, at about 62% of United States build costs. This page prices a school block — six-classroom block with a veranda, ablution block and rainwater goods — at 450 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Palau is USD ($), and a bill of quantities generated from your own drawings is priced in USD using the SMM7 standard.

Generate a bill of quantitiesFree preview · Priced in USD
Advertisement
Total construction cost
$474,300 – $948,600
Cost per m²
$1,054–$2,108/m² ($98–$196/ft²)
Gross floor area
450 m² (4,844 ft²) · 1 storey

What is being priced

The figures on this page price a school block in Palau at 450 m² (4,844 ft²) of gross floor area over 1 storey, specified as six-classroom block with a veranda, ablution block and rainwater goods. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$341,496 – $682,992
Standard finish$474,300 – $948,600
Premium finish$687,735 – $1,375,470
Advertisement

Where the money goes

Elemental split of construction cost for a school block of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure & foundations
Excavation, strip footings, hardcore, blinding, DPC and ground slab.
15%$71,145 – $142,290
Walling & superstructure
Masonry, lintels, ring beam and any suspended floor.
22%$104,346 – $208,692
Roofing
Trusses or rafters, covering, ceilings, fascia and rainwater goods.
14%$66,402 – $132,804
Internal finishes
Plaster, screed, floor and wall tiling, ceilings and painting.
18%$85,374 – $170,748
Joinery & fittings
Doors, windows, cupboards, worktops and ironmongery.
9%$42,687 – $85,374
Services (plumbing & electrical)
Wiring, distribution board, fittings, water reticulation, sanitaryware and drainage.
14%$66,402 – $132,804
External works & preliminaries
Site setup, supervision, paths, boundary works and connections.
8%$37,944 – $75,888

No drawings needed

Get a priced bill of quantities for your own house

The figures above are benchmarks for Palau. Tell us how big your build is and get the itemised version — every material and trade measured and priced in USD, — without needing architectural drawings.

Advertisement

Building school blocks in Palau — frequently asked

How much does it cost to build a school block in Palau?

+

Building a school block in Palau typically costs $474,300 to $948,600 in construction cost — roughly $1,054–$2,108 per m² ($98–$196 per ft²) over 450 m² (4,844 ft²) of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $341,496–$682,992; at a premium specification, $687,735–$1,375,470.

What is the cost per square metre in Palau?

+

About $1,054–$2,108 per m² ($98–$196 per ft²) for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Walling & superstructure — about 22% of construction cost, or $104,346–$208,692 on this build. Masonry, lintels, ring beam and any suspended floor.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in Palau?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in USD in the SMM7 format that Palau quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Palau sits at index 62 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.

Other build costs in Palau

For contractors & quantity surveyors

Tendering in Palau every month?

A one-off bill suits a single project. If you tender regularly, a monthly plan brings the cost of each bill right down, with no card to re-enter each time.

Get started freeCompare the options once you're in · cancel any time
Keep exploring
Advertisement

Get your bills of quantities free

Upload a floor plan and get a priced BoQ in minutes, in your country's format and currency. No card needed to start.