🇰🇵 North Korea · Construction cost guide · Updated 2026

How much does it cost to build a warehouse in North Korea?

Building a warehouse in North Korea typically costs $160,000 to $340,000 in construction cost — roughly $160–$340 per square metre over 1000 m² of floor area. That excludes land, professional fees and statutory charges.

North Korea is one of the lower-cost construction markets in the world — it ranks 199 of 200 countries on our construction cost index, at about 20% of United States build costs. This page prices a warehouse — portal-frame shed, sheeted walls and roof, power-floated slab, roller shutters, small office — at 1000 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in North Korea is KPW (₩), and a bill of quantities generated from your own drawings is priced in KPW using the Standard Estimating System standard.

Advertisement
Total construction cost
$160,000 – $340,000
Cost per m²
$160 – $340
Gross floor area
1000 m² · 1 storey

What is being priced

The figures on this page price a warehouse in North Korea at 1000 m² of gross floor area over 1 storey, specified as portal-frame shed, sheeted walls and roof, power-floated slab, roller shutters, small office. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$115,200$244,800
Standard finish$160,000$340,000
Premium finish$232,000$493,000
Advertisement

Where the money goes

Elemental split of construction cost for a warehouse of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure & floor slab
Excavation, footings, hardcore and a power-floated slab carrying vehicle loads.
22%$35,200$74,800
Structural frame
Portal frame or columns and rafters, including fabrication and erection.
30%$48,000$102,000
Envelope — roof & cladding
Sheeting, purlins, gutters, flashings and translucent roof lights.
20%$32,000$68,000
Doors, openings & fit-out
Roller shutters, personnel doors, and any office or ablution pod.
10%$16,000$34,000
Services
Power, lighting, fire protection and drainage.
10%$16,000$34,000
External works & preliminaries
Hardstanding, site setup, supervision and temporary works.
8%$12,800$27,200

Get the real number for your own plans

A benchmark tells you the ballpark. Upload your dimensioned drawings and get an itemised, source-cited bill of quantities priced in KPW (), measured to the Standard Estimating System standard North Korea professionals use.

Price my North Korea project
Advertisement

Building warehouses in North Korea — frequently asked

How much does it cost to build a warehouse in North Korea?

+

Building a warehouse in North Korea typically costs $160,000 to $340,000 in construction cost — roughly $160–$340 per square metre over 1000 m² of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $115,200–$244,800; at a premium specification, $232,000–$493,000.

What is the cost per square metre in North Korea?

+

About $160–$340 per m² for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Structural frame — about 30% of construction cost, or $48,000–$102,000 on this build. Portal frame or columns and rafters, including fabrication and erection.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in North Korea?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in KPW in the Standard Estimating System format that North Korea quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. North Korea sits at index 20 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.

Other build costs in North Korea

Keep exploring
Advertisement