🇰🇵 North Korea · Construction cost guide · Updated 2026

How much does it cost to build an office building in North Korea?

Building an office building in North Korea typically costs $856,800 to $1,713,600 in construction cost — roughly $357–$714 per m² ($33–$66 per ft²) over 2,400 m² (25,833 ft²) of floor area. That excludes land, professional fees and statutory charges.

North Korea is one of the lower-cost construction markets in the world — it ranks 199 of 200 countries on our construction cost index, at about 20% of United States build costs. This page prices an office building — three floors of open-plan office, RC frame, suspended ceilings, HVAC and lift allowance — at 2400 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in North Korea is KPW (₩), and a bill of quantities generated from your own drawings is priced in KPW using the Standard Estimating System standard.

Generate a bill of quantitiesFree preview · Priced in KPW
Advertisement
Total construction cost
$856,800 – $1,713,600
Cost per m²
$357–$714/m² ($33–$66/ft²)
Gross floor area
2,400 m² (25,833 ft²) · 3 storeys

What is being priced

The figures on this page price an office building in North Korea at 2,400 m² (25,833 ft²) of gross floor area over 3 storeys, specified as three floors of open-plan office, RC frame, suspended ceilings, HVAC and lift allowance. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$616,896 – $1,233,792
Standard finish$856,800 – $1,713,600
Premium finish$1,242,360 – $2,484,720
Advertisement

Where the money goes

Elemental split of construction cost for an office building of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure
Excavation, foundations and ground-floor slab.
12%$102,816 – $205,632
Structural frame & upper floors
Columns, beams, suspended slabs, stairs and cores.
24%$205,632 – $411,264
Envelope — walls, windows & roof
External walling, glazing, roof covering and waterproofing.
19%$162,792 – $325,584
Internal finishes & partitions
Partitions, plaster, screeds, floor and ceiling finishes, painting.
17%$145,656 – $291,312
Services (MEP)
Electrical, plumbing, drainage, HVAC and lifts — the biggest single risk on framed buildings.
21%$179,928 – $359,856
External works & preliminaries
Site setup, supervision, paving, boundary and drainage outside the footprint.
7%$59,976 – $119,952

No drawings needed

Get a priced bill of quantities for your own house

The figures above are benchmarks for North Korea. Tell us how big your build is and get the itemised version — every material and trade measured and priced in KPW, — without needing architectural drawings.

Advertisement

Building office buildings in North Korea — frequently asked

How much does it cost to build an office building in North Korea?

+

Building an office building in North Korea typically costs $856,800 to $1,713,600 in construction cost — roughly $357–$714 per m² ($33–$66 per ft²) over 2,400 m² (25,833 ft²) of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $616,896–$1,233,792; at a premium specification, $1,242,360–$2,484,720.

What is the cost per square metre in North Korea?

+

About $357–$714 per m² ($33–$66 per ft²) for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Structural frame & upper floors — about 24% of construction cost, or $205,632–$411,264 on this build. Columns, beams, suspended slabs, stairs and cores.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in North Korea?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in KPW in the Standard Estimating System format that North Korea quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. North Korea sits at index 20 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.

Other build costs in North Korea

For contractors & quantity surveyors

Tendering in North Korea every month?

A one-off bill suits a single project. If you tender regularly, a monthly plan brings the cost of each bill right down, with no card to re-enter each time.

Get started freeCompare the options once you're in · cancel any time
Keep exploring
Advertisement

Get your bills of quantities free

Upload a floor plan and get a priced BoQ in minutes, in your country's format and currency. No card needed to start.