🇱🇹 Lithuania · Construction cost guide · Updated 2026
How much does it cost to build a hotel in Lithuania?
Building a hotel in Lithuania typically costs $11,420,000 to $22,850,000 in construction cost — roughly $1,142–$2,285 per square metre over 10000 m² of floor area. That excludes land, professional fees and statutory charges.
Lithuania is a mid-cost construction market — it ranks 47 of 200 countries on our construction cost index, at about 64% of United States build costs. This page prices a hotel — roughly 50 keys over four floors, RC frame, lift, kitchen, back-of-house and restaurant — at 10000 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Lithuania is EUR (€), and a bill of quantities generated from your own drawings is priced in EUR using the Elemental cost breakdown standard.
What is being priced
The figures on this page price a hotel in Lithuania at 10000 m² of gross floor area over 4 storeys, specified as roughly 50 keys over four floors, RC frame, lift, kitchen, back-of-house and restaurant. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.
Cost by specification level
| Specification | Construction cost (USD) |
|---|---|
| Basic / low-cost finish | $8,222,400 – $16,452,000 |
| Standard finish | $11,420,000 – $22,850,000 |
| Premium finish | $16,559,000 – $33,132,500 |
Where the money goes
Elemental split of construction cost for a hotel of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.
| Element | Share | Cost (USD) |
|---|---|---|
Substructure Excavation, foundations and ground-floor slab. | 12% | $1,370,400 – $2,742,000 |
Structural frame & upper floors Columns, beams, suspended slabs, stairs and cores. | 24% | $2,740,800 – $5,484,000 |
Envelope — walls, windows & roof External walling, glazing, roof covering and waterproofing. | 19% | $2,169,800 – $4,341,500 |
Internal finishes & partitions Partitions, plaster, screeds, floor and ceiling finishes, painting. | 17% | $1,941,400 – $3,884,500 |
Services (MEP) Electrical, plumbing, drainage, HVAC and lifts — the biggest single risk on framed buildings. | 21% | $2,398,200 – $4,798,500 |
External works & preliminaries Site setup, supervision, paving, boundary and drainage outside the footprint. | 7% | $799,400 – $1,599,500 |
Get the real number for your own plans
A benchmark tells you the ballpark. Upload your dimensioned drawings and get an itemised, source-cited bill of quantities priced in EUR (€), measured to the Elemental cost breakdown standard Lithuania professionals use.
Price my Lithuania projectBuilding hotels in Lithuania — frequently asked
How much does it cost to build a hotel in Lithuania?
+
Building a hotel in Lithuania typically costs $11,420,000 to $22,850,000 in construction cost — roughly $1,142–$2,285 per square metre over 10000 m² of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $8,222,400–$16,452,000; at a premium specification, $16,559,000–$33,132,500.
What is the cost per square metre in Lithuania?
+
About $1,142–$2,285 per m² for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.
What is the biggest cost item?
+
Structural frame & upper floors — about 24% of construction cost, or $2,740,800–$5,484,000 on this build. Columns, beams, suspended slabs, stairs and cores.
Does this include land, fees and furniture?
+
No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.
How do I get an accurate figure for my own plans in Lithuania?
+
Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in EUR in the Elemental cost breakdown format that Lithuania quantity surveyors and lenders expect — free to preview.
Why do build costs vary so much between countries?
+
Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Lithuania sits at index 64 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.