How much does it cost to build a hotel in Jordan?

Building a hotel in Jordan typically costs $7,140,000 to $14,280,000 in construction cost — roughly $714–$1,428 per square metre over 10000 m² of floor area. That excludes land, professional fees and statutory charges.

Jordan is a relatively low-cost construction market — it ranks 101 of 200 countries on our construction cost index, at about 40% of United States build costs. This page prices a hotel — roughly 50 keys over four floors, RC frame, lift, kitchen, back-of-house and restaurant — at 10000 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Jordan is JOD (د.ا), and a bill of quantities generated from your own drawings is priced in JOD using the POMI standard.

Advertisement
Total construction cost
$7,140,000 – $14,280,000
Cost per m²
$714 – $1,428
Gross floor area
10000 m² · 4 storeys

What is being priced

The figures on this page price a hotel in Jordan at 10000 m² of gross floor area over 4 storeys, specified as roughly 50 keys over four floors, RC frame, lift, kitchen, back-of-house and restaurant. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$5,140,800$10,281,600
Standard finish$7,140,000$14,280,000
Premium finish$10,353,000$20,706,000
Advertisement

Where the money goes

Elemental split of construction cost for a hotel of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure
Excavation, foundations and ground-floor slab.
12%$856,800$1,713,600
Structural frame & upper floors
Columns, beams, suspended slabs, stairs and cores.
24%$1,713,600$3,427,200
Envelope — walls, windows & roof
External walling, glazing, roof covering and waterproofing.
19%$1,356,600$2,713,200
Internal finishes & partitions
Partitions, plaster, screeds, floor and ceiling finishes, painting.
17%$1,213,800$2,427,600
Services (MEP)
Electrical, plumbing, drainage, HVAC and lifts — the biggest single risk on framed buildings.
21%$1,499,400$2,998,800
External works & preliminaries
Site setup, supervision, paving, boundary and drainage outside the footprint.
7%$499,800$999,600

Get the real number for your own plans

A benchmark tells you the ballpark. Upload your dimensioned drawings and get an itemised, source-cited bill of quantities priced in JOD (د.ا), measured to the POMI standard Jordan professionals use.

Price my Jordan project
Advertisement

Building hotels in Jordan — frequently asked

How much does it cost to build a hotel in Jordan?

+

Building a hotel in Jordan typically costs $7,140,000 to $14,280,000 in construction cost — roughly $714–$1,428 per square metre over 10000 m² of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $5,140,800–$10,281,600; at a premium specification, $10,353,000–$20,706,000.

What is the cost per square metre in Jordan?

+

About $714–$1,428 per m² for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Structural frame & upper floors — about 24% of construction cost, or $1,713,600–$3,427,200 on this build. Columns, beams, suspended slabs, stairs and cores.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in Jordan?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in JOD in the POMI format that Jordan quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Jordan sits at index 40 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.