🇯🇵 Japan · Construction cost guide · Updated 2026

How much does it cost to build a 5-bedroom house in Japan?

Building a 5-bedroom house in Japan typically costs $988,160 to $1,834,880 in construction cost — roughly $1,544–$2,867 per square metre over 640 m² of floor area. That excludes land, professional fees and statutory charges.

Japan is a high-cost construction market by global standards — it ranks 18 of 200 countries on our construction cost index, at about 105% of United States build costs. This page prices a 5-bedroom house — two-storey, five bedrooms, three bathrooms, double garage, upper-floor suspended slab — at 640 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Japan is JPY (¥), and a bill of quantities generated from your own drawings is priced in JPY using the Building Quantity Survey Standard standard.

Advertisement
Total construction cost
$988,160 – $1,834,880
Cost per m²
$1,544 – $2,867
Gross floor area
640 m² · 2 storeys

What is being priced

The figures on this page price a 5-bedroom house in Japan at 640 m² of gross floor area over 2 storeys, specified as two-storey, five bedrooms, three bathrooms, double garage, upper-floor suspended slab. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$711,475$1,321,114
Standard finish$988,160$1,834,880
Premium finish$1,432,832$2,660,576
Advertisement

Where the money goes

Elemental split of construction cost for a 5-bedroom house of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure & foundations
Excavation, strip footings, hardcore, blinding, DPC and ground slab.
15%$148,224$275,232
Walling & superstructure
Masonry, lintels, ring beam and any suspended floor.
22%$217,395$403,674
Roofing
Trusses or rafters, covering, ceilings, fascia and rainwater goods.
14%$138,342$256,883
Internal finishes
Plaster, screed, floor and wall tiling, ceilings and painting.
18%$177,869$330,278
Joinery & fittings
Doors, windows, cupboards, worktops and ironmongery.
9%$88,934$165,139
Services (plumbing & electrical)
Wiring, distribution board, fittings, water reticulation, sanitaryware and drainage.
14%$138,342$256,883
External works & preliminaries
Site setup, supervision, paths, boundary works and connections.
8%$79,053$146,790

Get the real number for your own plans

A benchmark tells you the ballpark. Upload your dimensioned drawings and get an itemised, source-cited bill of quantities priced in JPY (¥), measured to the Building Quantity Survey Standard standard Japan professionals use.

Price my Japan project
Advertisement

Building 5-bedroom houses in Japan — frequently asked

How much does it cost to build a 5-bedroom house in Japan?

+

Building a 5-bedroom house in Japan typically costs $988,160 to $1,834,880 in construction cost — roughly $1,544–$2,867 per square metre over 640 m² of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $711,475–$1,321,114; at a premium specification, $1,432,832–$2,660,576.

What is the cost per square metre in Japan?

+

About $1,544–$2,867 per m² for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Walling & superstructure — about 22% of construction cost, or $217,395–$403,674 on this build. Masonry, lintels, ring beam and any suspended floor.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in Japan?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in JPY in the Building Quantity Survey Standard format that Japan quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Japan sits at index 105 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.

Other build costs in Japan

Keep exploring
Advertisement