🇨🇻 Cape Verde · Construction cost guide · Updated 2026

How much does it cost to build a warehouse in Cape Verde?

Building a warehouse in Cape Verde typically costs $320,000 to $680,000 in construction cost — roughly $320–$680 per m² ($30–$63 per ft²) over 1,000 m² (10,764 ft²) of floor area. That excludes land, professional fees and statutory charges.

Cape Verde is a relatively low-cost construction market — it ranks 97 of 200 countries on our construction cost index, at about 40% of United States build costs. This page prices a warehouse — portal-frame shed, sheeted walls and roof, power-floated slab, roller shutters, small office — at 1000 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Cape Verde is CVE (CVE), and a bill of quantities generated from your own drawings is priced in CVE using the Mapa de Quantidades standard.

Generate a bill of quantitiesFree preview · Priced in CVE
Advertisement
Total construction cost
$320,000 – $680,000
Cost per m²
$320–$680/m² ($30–$63/ft²)
Gross floor area
1,000 m² (10,764 ft²) · 1 storey

What is being priced

The figures on this page price a warehouse in Cape Verde at 1,000 m² (10,764 ft²) of gross floor area over 1 storey, specified as portal-frame shed, sheeted walls and roof, power-floated slab, roller shutters, small office. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$230,400 – $489,600
Standard finish$320,000 – $680,000
Premium finish$464,000 – $986,000
Advertisement

Where the money goes

Elemental split of construction cost for a warehouse of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure & floor slab
Excavation, footings, hardcore and a power-floated slab carrying vehicle loads.
22%$70,400 – $149,600
Structural frame
Portal frame or columns and rafters, including fabrication and erection.
30%$96,000 – $204,000
Envelope — roof & cladding
Sheeting, purlins, gutters, flashings and translucent roof lights.
20%$64,000 – $136,000
Doors, openings & fit-out
Roller shutters, personnel doors, and any office or ablution pod.
10%$32,000 – $68,000
Services
Power, lighting, fire protection and drainage.
10%$32,000 – $68,000
External works & preliminaries
Hardstanding, site setup, supervision and temporary works.
8%$25,600 – $54,400

No drawings needed

Get a priced bill of quantities for your own house

The figures above are benchmarks for Cape Verde. Tell us how big your build is and get the itemised version — every material and trade measured and priced in CVE, — without needing architectural drawings.

Advertisement

Building warehouses in Cape Verde — frequently asked

How much does it cost to build a warehouse in Cape Verde?

+

Building a warehouse in Cape Verde typically costs $320,000 to $680,000 in construction cost — roughly $320–$680 per m² ($30–$63 per ft²) over 1,000 m² (10,764 ft²) of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $230,400–$489,600; at a premium specification, $464,000–$986,000.

What is the cost per square metre in Cape Verde?

+

About $320–$680 per m² ($30–$63 per ft²) for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Structural frame — about 30% of construction cost, or $96,000–$204,000 on this build. Portal frame or columns and rafters, including fabrication and erection.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in Cape Verde?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in CVE in the Mapa de Quantidades format that Cape Verde quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Cape Verde sits at index 40 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.

Other build costs in Cape Verde

For contractors & quantity surveyors

Tendering in Cape Verde every month?

A one-off bill suits a single project. If you tender regularly, a monthly plan brings the cost of each bill right down, with no card to re-enter each time.

Get started freeCompare the options once you're in · cancel any time
Keep exploring
Advertisement

Get your bills of quantities free

Upload a floor plan and get a priced BoQ in minutes, in your country's format and currency. No card needed to start.