Building a shop in Brunei typically costs $112,200 to $224,400 in construction cost — roughly $87–$174 per ft² ($935–$1,870 per m²) over 1,292 ft² (120 m²) of floor area. That excludes land, professional fees and statutory charges.
Brunei is a mid-cost construction market — it ranks 66 of 200 countries on our construction cost index, at about 55% of United States build costs. This page prices a shop — single retail unit with a shopfront, back store, staff WC and basic fit-out — at 120 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Brunei is BND ($), and a bill of quantities generated from your own drawings is priced in BND using the SISV SMM2 standard.
What is being priced
The figures on this page price a shop in Brunei at 1,292 ft² (120 m²) of gross floor area over 1 storey, specified as single retail unit with a shopfront, back store, staff WC and basic fit-out. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.
Cost by specification level
| Specification | Construction cost (USD) |
|---|---|
| Basic / low-cost finish | $80,784 – $161,568 |
| Standard finish | $112,200 – $224,400 |
| Premium finish | $162,690 – $325,380 |
Where the money goes
Elemental split of construction cost for a shop of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.
| Element | Share | Cost (USD) |
|---|---|---|
Substructure & foundations Excavation, strip footings, hardcore, blinding, DPC and ground slab. | 15% | $16,830 – $33,660 |
Walling & superstructure Masonry, lintels, ring beam and any suspended floor. | 22% | $24,684 – $49,368 |
Roofing Trusses or rafters, covering, ceilings, fascia and rainwater goods. | 14% | $15,708 – $31,416 |
Internal finishes Plaster, screed, floor and wall tiling, ceilings and painting. | 18% | $20,196 – $40,392 |
Joinery & fittings Doors, windows, cupboards, worktops and ironmongery. | 9% | $10,098 – $20,196 |
Services (plumbing & electrical) Wiring, distribution board, fittings, water reticulation, sanitaryware and drainage. | 14% | $15,708 – $31,416 |
External works & preliminaries Site setup, supervision, paths, boundary works and connections. | 8% | $8,976 – $17,952 |
No drawings needed
Get a priced bill of quantities for your own house
The figures above are benchmarks for Brunei. Tell us how big your build is and get the itemised version — every material and trade measured and priced in BND, — without needing architectural drawings.
Building shops in Brunei — frequently asked
How much does it cost to build a shop in Brunei?
+
Building a shop in Brunei typically costs $112,200 to $224,400 in construction cost — roughly $87–$174 per ft² ($935–$1,870 per m²) over 1,292 ft² (120 m²) of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $80,784–$161,568; at a premium specification, $162,690–$325,380.
What is the cost per square foot in Brunei?
+
About $87–$174 per ft² ($935–$1,870 per m²) for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.
What is the biggest cost item?
+
Walling & superstructure — about 22% of construction cost, or $24,684–$49,368 on this build. Masonry, lintels, ring beam and any suspended floor.
Does this include land, fees and furniture?
+
No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.
How do I get an accurate figure for my own plans in Brunei?
+
Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in BND in the SISV SMM2 format that Brunei quantity surveyors and lenders expect — free to preview.
Why do build costs vary so much between countries?
+
Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Brunei sits at index 55 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.