How much does it cost to build a garage in Bosnia and Herzegovina?

Building a garage in Bosnia and Herzegovina typically costs $21,168 to $39,312 in construction cost — roughly $588–$1,092 per m² ($55–$101 per ft²) over 36 m² (388 ft²) of floor area. That excludes land, professional fees and statutory charges.

Bosnia and Herzegovina is a relatively low-cost construction market — it ranks 91 of 200 countries on our construction cost index, at about 42% of United States build costs. This page prices a garage — double garage, masonry walls, concrete slab, roller door, unheated — at 36 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Bosnia and Herzegovina is BAM (KM), and a bill of quantities generated from your own drawings is priced in BAM using the Elemental cost breakdown standard.

Generate a bill of quantitiesFree preview · Priced in BAM
Advertisement
Total construction cost
$21,168 – $39,312
Cost per m²
$588–$1,092/m² ($55–$101/ft²)
Gross floor area
36 m² (388 ft²) · 1 storey

What is being priced

The figures on this page price a garage in Bosnia and Herzegovina at 36 m² (388 ft²) of gross floor area over 1 storey, specified as double garage, masonry walls, concrete slab, roller door, unheated. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$15,241 – $28,305
Standard finish$21,168 – $39,312
Premium finish$30,694 – $57,002
Advertisement

Where the money goes

Elemental split of construction cost for a garage of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure & foundations
Excavation, strip footings, hardcore, blinding, DPC and ground slab.
15%$3,175 – $5,897
Walling & superstructure
Masonry, lintels, ring beam and any suspended floor.
22%$4,657 – $8,649
Roofing
Trusses or rafters, covering, ceilings, fascia and rainwater goods.
14%$2,964 – $5,504
Internal finishes
Plaster, screed, floor and wall tiling, ceilings and painting.
18%$3,810 – $7,076
Joinery & fittings
Doors, windows, cupboards, worktops and ironmongery.
9%$1,905 – $3,538
Services (plumbing & electrical)
Wiring, distribution board, fittings, water reticulation, sanitaryware and drainage.
14%$2,964 – $5,504
External works & preliminaries
Site setup, supervision, paths, boundary works and connections.
8%$1,693 – $3,145

No drawings needed

Get a priced bill of quantities for your own house

The figures above are benchmarks for Bosnia and Herzegovina. Tell us how big your build is and get the itemised version — every material and trade measured and priced in BAM, — without needing architectural drawings.

Advertisement

Building garages in Bosnia and Herzegovina — frequently asked

How much does it cost to build a garage in Bosnia and Herzegovina?

+

Building a garage in Bosnia and Herzegovina typically costs $21,168 to $39,312 in construction cost — roughly $588–$1,092 per m² ($55–$101 per ft²) over 36 m² (388 ft²) of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $15,241–$28,305; at a premium specification, $30,694–$57,002.

What is the cost per square metre in Bosnia and Herzegovina?

+

About $588–$1,092 per m² ($55–$101 per ft²) for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Walling & superstructure — about 22% of construction cost, or $4,657–$8,649 on this build. Masonry, lintels, ring beam and any suspended floor.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in Bosnia and Herzegovina?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in BAM in the Elemental cost breakdown format that Bosnia and Herzegovina quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Bosnia and Herzegovina sits at index 42 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.

Other build costs in Bosnia and Herzegovina

For contractors & quantity surveyors

Tendering in Bosnia and Herzegovina every month?

A one-off bill suits a single project. If you tender regularly, a monthly plan brings the cost of each bill right down, with no card to re-enter each time.

Get started freeCompare the options once you're in · cancel any time
Keep exploring
Advertisement

Get your bills of quantities free

Upload a floor plan and get a priced BoQ in minutes, in your country's format and currency. No card needed to start.