🇦🇹 Austria · Construction cost guide · Updated 2026

How much does it cost to build a bungalow in Austria?

Building a bungalow in Austria typically costs $196,560 to $365,040 in construction cost — roughly $1,512–$2,808 per m² ($140–$261 per ft²) over 130 m² (1,399 ft²) of floor area. That excludes land, professional fees and statutory charges.

Austria is a high-cost construction market by global standards — it ranks 13 of 200 countries on our construction cost index, at about 108% of United States build costs. This page prices a bungalow — single-storey dwelling on a strip foundation with a pitched roof over the full footprint — at 130 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Austria is EUR (€), and a bill of quantities generated from your own drawings is priced in EUR using the VOB / DIN 276 standard.

Generate a bill of quantitiesFree preview · Priced in EUR
Advertisement
Total construction cost
$196,560 – $365,040
Cost per m²
$1,512–$2,808/m² ($140–$261/ft²)
Gross floor area
130 m² (1,399 ft²) · 1 storey

What is being priced

The figures on this page price a bungalow in Austria at 130 m² (1,399 ft²) of gross floor area over 1 storey, specified as single-storey dwelling on a strip foundation with a pitched roof over the full footprint. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$141,523 – $262,829
Standard finish$196,560 – $365,040
Premium finish$285,012 – $529,308
Advertisement

Where the money goes

Elemental split of construction cost for a bungalow of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure & foundations
Excavation, strip footings, hardcore, blinding, DPC and ground slab.
15%$29,484 – $54,756
Walling & superstructure
Masonry, lintels, ring beam and any suspended floor.
22%$43,243 – $80,309
Roofing
Trusses or rafters, covering, ceilings, fascia and rainwater goods.
14%$27,518 – $51,106
Internal finishes
Plaster, screed, floor and wall tiling, ceilings and painting.
18%$35,381 – $65,707
Joinery & fittings
Doors, windows, cupboards, worktops and ironmongery.
9%$17,690 – $32,854
Services (plumbing & electrical)
Wiring, distribution board, fittings, water reticulation, sanitaryware and drainage.
14%$27,518 – $51,106
External works & preliminaries
Site setup, supervision, paths, boundary works and connections.
8%$15,725 – $29,203

No drawings needed

Get a priced bill of quantities for your own house

The figures above are benchmarks for Austria. Tell us how big your build is and get the itemised version — every material and trade measured and priced in EUR, — without needing architectural drawings.

Advertisement

Building bungalows in Austria — frequently asked

How much does it cost to build a bungalow in Austria?

+

Building a bungalow in Austria typically costs $196,560 to $365,040 in construction cost — roughly $1,512–$2,808 per m² ($140–$261 per ft²) over 130 m² (1,399 ft²) of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $141,523–$262,829; at a premium specification, $285,012–$529,308.

What is the cost per square metre in Austria?

+

About $1,512–$2,808 per m² ($140–$261 per ft²) for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Walling & superstructure — about 22% of construction cost, or $43,243–$80,309 on this build. Masonry, lintels, ring beam and any suspended floor.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in Austria?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in EUR in the VOB / DIN 276 format that Austria quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Austria sits at index 108 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.

Other build costs in Austria

For contractors & quantity surveyors

Tendering in Austria every month?

A one-off bill suits a single project. If you tender regularly, a monthly plan brings the cost of each bill right down, with no card to re-enter each time.

Get started freeCompare the options once you're in · cancel any time
Keep exploring
Advertisement

Get your bills of quantities free

Upload a floor plan and get a priced BoQ in minutes, in your country's format and currency. No card needed to start.