🇦🇩 Andorra · Construction cost guide · Updated 2026

How much does it cost to build a clinic in Andorra?

Building a clinic in Andorra typically costs $484,500 to $969,000 in construction cost — roughly $1,615–$3,230 per m² ($150–$300 per ft²) over 300 m² (3,229 ft²) of floor area. That excludes land, professional fees and statutory charges.

Andorra is a high-cost construction market by global standards — it ranks 25 of 200 countries on our construction cost index, at about 95% of United States build costs. This page prices a clinic — primary-care clinic: consulting rooms, treatment room, waiting area, dispensary, ablutions — at 300 m² of gross floor area, then breaks the cost down element by element so you can see where the money actually goes. Costs are quoted in USD for comparability; the local currency in Andorra is EUR (€), and a bill of quantities generated from your own drawings is priced in EUR using the Mediciones y Presupuesto standard.

Generate a bill of quantitiesFree preview · Priced in EUR
Advertisement
Total construction cost
$484,500 – $969,000
Cost per m²
$1,615–$3,230/m² ($150–$300/ft²)
Gross floor area
300 m² (3,229 ft²) · 1 storey

What is being priced

The figures on this page price a clinic in Andorra at 300 m² (3,229 ft²) of gross floor area over 1 storey, specified as primary-care clinic: consulting rooms, treatment room, waiting area, dispensary, ablutions. Construction cost only — land, professional fees, statutory charges, utility connections and loose furniture are all excluded, and together commonly add another 15–30%.

Cost by specification level

SpecificationConstruction cost (USD)
Basic / low-cost finish$348,840 – $697,680
Standard finish$484,500 – $969,000
Premium finish$702,525 – $1,405,050
Advertisement

Where the money goes

Elemental split of construction cost for a clinic of this type. Percentages are concept-stage cost-planning proportions; the ranges below apply them to the totals above.

ElementShareCost (USD)
Substructure & foundations
Excavation, strip footings, hardcore, blinding, DPC and ground slab.
15%$72,675 – $145,350
Walling & superstructure
Masonry, lintels, ring beam and any suspended floor.
22%$106,590 – $213,180
Roofing
Trusses or rafters, covering, ceilings, fascia and rainwater goods.
14%$67,830 – $135,660
Internal finishes
Plaster, screed, floor and wall tiling, ceilings and painting.
18%$87,210 – $174,420
Joinery & fittings
Doors, windows, cupboards, worktops and ironmongery.
9%$43,605 – $87,210
Services (plumbing & electrical)
Wiring, distribution board, fittings, water reticulation, sanitaryware and drainage.
14%$67,830 – $135,660
External works & preliminaries
Site setup, supervision, paths, boundary works and connections.
8%$38,760 – $77,520

No drawings needed

Get a priced bill of quantities for your own house

The figures above are benchmarks for Andorra. Tell us how big your build is and get the itemised version — every material and trade measured and priced in EUR, — without needing architectural drawings.

Advertisement

Building clinics in Andorra — frequently asked

How much does it cost to build a clinic in Andorra?

+

Building a clinic in Andorra typically costs $484,500 to $969,000 in construction cost — roughly $1,615–$3,230 per m² ($150–$300 per ft²) over 300 m² (3,229 ft²) of floor area. That excludes land, professional fees and statutory charges. At a basic specification the same building lands nearer $348,840–$697,680; at a premium specification, $702,525–$1,405,050.

What is the cost per square metre in Andorra?

+

About $1,615–$3,230 per m² ($150–$300 per ft²) for this building type at a standard finish. Per-m² rates rise with storey height (frame, cores and cranage) and with specification, and fall on simple single-storey plans.

What is the biggest cost item?

+

Walling & superstructure — about 22% of construction cost, or $106,590–$213,180 on this build. Masonry, lintels, ring beam and any suspended floor.

Does this include land, fees and furniture?

+

No. These are construction costs only — materials, labour, plant and site preliminaries. Land, statutory approvals, professional fees, connections, landscaping and loose furniture are all additional, and together commonly add 15–30% on top.

How do I get an accurate figure for my own plans in Andorra?

+

Benchmarks give you the ballpark; a measured bill of quantities gives you the number. Upload your dimensioned floor plans to Enormous Buildings and get an itemised, source-cited BoQ in EUR in the Mediciones y Presupuesto format that Andorra quantity surveyors and lenders expect — free to preview.

Why do build costs vary so much between countries?

+

Three things dominate: labour cost, how much of the material basket is imported, and the code requirements the building must satisfy. Andorra sits at index 95 against the United States at 100, which is why the figures above differ from what you'd see quoted for the same building elsewhere.

Other build costs in Andorra

For contractors & quantity surveyors

Tendering in Andorra every month?

A one-off bill suits a single project. If you tender regularly, a monthly plan brings the cost of each bill right down, with no card to re-enter each time.

Get started freeCompare the options once you're in · cancel any time
Keep exploring
Advertisement

Get your bills of quantities free

Upload a floor plan and get a priced BoQ in minutes, in your country's format and currency. No card needed to start.