Construction materials calculator for Netherlands

How many bricks, bags of cement, cubic metres of sand and square metres of roofing does a house in the Netherlands actually need? These quantities are computed from the way buildings are built here — 225 mm external walls at 110 units per m², 1:5 mortar, 1:2:4 concrete and a 25° roof — not from a global average. Quantities only: material prices move week to week, so pricing happens against your own drawings.

Advertisement

Materials by house size in Netherlands

Floor areaBlocks / bricksCement (50 kg bags)Sand (m³)Roof covering (m²)
5013,450128877
9018,04420612130
12020,83526115170
15023,29631317209
20026,89939822274
25030,07448626339
30032,94456830403

Single-storey, computed from Netherlands construction conventions. Cement totals include mortar, concrete, plaster and screed.

Advertisement

Full material takeoff — 150 m² house

Substructure

Trench excavation
50 m perimeter × 0.4 m wide × 0.75 m deep
15
Mass concrete footings
225 mm thick strip footing, mix 1:2:4
4.5
Hardcore filling
150 mm bed under the ground slab
22.5
Blinding concrete
50 mm blinding over hardcore
7.5
Ground floor slab concrete
100 mm slab over 150 m²
15
Damp-proof course / membrane
Slab area plus 10% laps
165

Walling

External walling units (bricks/blocks)
115 m² face × 110/m² × 1.05 wastage
13,254 no.
Internal walling units
174 m² face × 55/m² × 1.05 wastage
10,042 no.
Mortar cement
5 m³ mortar at 1:5
32 bags (50 kg)
Mortar sand
1:5 mix, dry factor 1.33
5.6

Concrete & reinforcement

Cement — general concrete
Footings and blinding, 12 m³
76 bags (50 kg)
Cement — structural concrete
Slabs, 15 m³ at 1:1.5:3
121 bags (50 kg)
River / pit sand
Combined concrete sand requirement
11.6
Coarse aggregate (stone)
Combined concrete stone requirement
23.2
Reinforcement steel
Slab 80 kg/m³, ring beam 110 kg/m³
1,420 kg
Advertisement

Roofing

Roof covering area
173 m² plan opened out at 25° plus 10% laps
209.4
Roof timber / trusses
Trusses at ~1.2 m centres plus wall plates
100 m run
Ceiling boards
Floor area plus 5% cutting
157.5
Fascia, barge & rainwater goods
Perimeter plus gable rake
57.5 m run

Finishes

Plaster / render area
External face plus both faces of internal walls
471.8
Cement — plaster
15 mm external, 12 mm internal, 1:5
38 bags (50 kg)
Floor screed cement
40 mm screed at 1:4
46 bags (50 kg)
Floor tiles / finish
Floor area × 1.05 wastage
157.5
Paint
Two coats at 10 m² per litre per coat
94 litres

Joinery & services

Doors
~1 per 12 m² of floor area
13 no.
Windows
~1 per 14 m² of floor area
11 no.
Lighting points
0.12/m²
18 no.
Socket outlets
0.18/m²
27 no.
WC suites
Typical fixture count per dwelling
2 no.
Wash hand basins
Typical fixture count per dwelling
2 no.
Septic tank & soakaway
Municipal sewer is not generally available; on-site treatment assumed
1 item

Go deeper on one material

What these numbers assume

  • Footprint taken as a 15 m × 10 m rectangle (150 m²), 1 storey.
  • Wall height 2.7 m; external walls 225 mm, internal 115 mm — the NL convention.
  • Openings deducted at 15% of external and 8% of internal wall face.
  • Foundation taken 0.75 m deep — governed by a design frost depth of 0.6 m.
  • Wastage allowance of 5% applied to bricks, tiles and paint.
  • Low seismic risk assumed.
  • Normal wind loading assumed.

Measure your actual plan instead of a rectangle

These quantities come from a representative footprint. Upload your dimensioned drawings and get the quantities measured off your real plan, priced in EUR ().

Take off my drawings

Building materials in Netherlands — frequently asked

How many bricks do I need to build a house in the Netherlands?

+

For a 150 m² single-storey house built the way houses are built in the Netherlands — 225 mm external walls at 110 units per m² — you need roughly 23,296 walling units including a 5% wastage allowance. Scale it from the table above for your own floor area.

How many bags of cement does a house need in the Netherlands?

+

About 313 bags of 50 kg cement for a 150 m² single-storey house, across mortar (1:5), concrete (1:2:4), plaster and screed. Mixes are the ones conventionally specified here, so the figure moves if your engineer specifies richer mixes.

How much sand and stone will I need?

+

Roughly 17 m³ of sand and a comparable volume of coarse aggregate for a 150 m² house. Order by the load and account for bulking and compaction — delivered volume and placed volume are not the same number.

How accurate are these quantities?

+

They are geometry-derived planning quantities from a rectangular footprint, so they are the right order of magnitude and internally consistent — good enough to budget and to sanity-check a supplier's list. They are not a measured takeoff of *your* plan. For that, upload your drawings and get an itemised bill of quantities measured to STABU / NL-SfB and priced in EUR.

Why are the quantities different from other countries?

+

Because the buildings are different. Wall thickness, block size, mortar and concrete mixes, foundation depth and roof pitch are all national conventions, and each one moves the quantities. This page is computed from the Netherlands profile specifically, not a global average.

Keep exploring
Advertisement