How much concrete do you need to build a house in Guinea-Bissau?

A 150 m² single-storey house in Guinea-Bissau needs roughly 27 m³ of concrete — about 0.18 m³ per m² of floor area. That is computed from Guinea-Bissau construction conventions, including the local wastage allowance.

Concrete quantities for a house in Guinea-Bissau, computed from how buildings are actually put up here rather than from a global average. The tables below run from a small 50 m² dwelling to a 400 m² family home, and the method section shows how to reproduce every figure by hand so you can adapt it to your own plan.

Advertisement

Concrete by house size in Guinea-Bissau

Floor areaConcrete requiredPer m² of floor
5010 0.20
7515 0.20
10019 0.19
15027 0.18
20035 0.17
25043 0.17
30051 0.17
40067 0.17

Single-storey. The per-m² rate falls as the house grows — a small house has more wall and roof per square metre of floor than a large one, which is why these are computed size by size rather than scaled from a single rate.

Where it goes — 150 m² house

Mass concrete footings
225 mm thick strip footing, mix 1:2:4
4.5
Blinding concrete
50 mm blinding over hardcore
7.5
Ground floor slab concrete
100 mm slab over 150 m²
15
Advertisement

What drives the quantity in Guinea-Bissau

FactorLocal valueEffect
Footing width400 mmWidth × depth × perimeter is the entire footing volume.
Footing depth0.6 mThe conventional depth here, before any frost or soil requirement raises it.
Slab thickness100 mmOver the whole footprint — usually the largest single pour on a house.
Blinding thickness50 mmThin, lean layer that gives a clean surface to work off. Easy to forget when ordering.
General mix1:2:4Footings and blinding.
Structural mix1:1.5:3Slabs and any framed elements.

How to calculate it yourself

  1. 01

    Footings: perimeter × 0.4 m width × the thickness of the concrete (not the trench depth — the trench is deeper than the concrete in it).

  2. 02

    Slab: floor area × 0.1 m.

  3. 03

    Blinding: floor area × 0.05 m.

  4. 04

    Add 5% for over-excavation and spillage — trenches are never as neat as the drawing.

  5. 05

    Order ready-mix in whole loads if available; site-mixing beyond about 10 m³ per pour rarely saves money once labour and inconsistency are counted.

Advertisement

Buying and site notes

  • A cold joint costs more than the concrete. Plan each pour so it can be completed continuously.
  • Never add water on site to make placing easier — it is the single most common cause of concrete failing its strength test.
  • Cure for at least seven days. Concrete that dries instead of curing reaches a fraction of its design strength, and nothing later fixes it.

Get every material measured off your own plan

This page works from a representative footprint. Upload your dimensioned drawings and get the full schedule — every material, measured from your real geometry and priced in XOF (CFA).

Take off my drawings

Concrete in Guinea-Bissau — frequently asked

How much concrete does a house need in Guinea-Bissau?

+

A 150 m² single-storey house in Guinea-Bissau needs roughly 27 m³ of concrete — about 0.18 m³ per m² of floor area. That is computed from Guinea-Bissau construction conventions, including the local wastage allowance.

How much concrete per square metre in Guinea-Bissau?

+

About 0.18 m³ per m² of floor area for a single-storey house. The figure is not linear across sizes — a small house has proportionally more wall and roof per m² of floor than a large one, which is why the table above is computed size by size rather than scaled from one rate.

What changes the quantity of concrete needed?

+

Footing width (400 mm) — Width × depth × perimeter is the entire footing volume. Footing depth (0.6 m) — The conventional depth here, before any frost or soil requirement raises it. Slab thickness (100 mm) — Over the whole footprint — usually the largest single pour on a house.

Is wastage included?

+

Where it applies, yes — a 5% allowance is carried on the perishable materials (walling units, tiles, paint). Bulk materials like sand and stone carry handling loss instead. Ordering the theoretical quantity with no allowance reliably means a second delivery at a worse price.

How accurate is this for my own house?

+

It is a planning quantity derived from a representative rectangular footprint, so it is the right order of magnitude and internally consistent — good for budgeting and for checking a supplier's list. It is not a measured takeoff of your plan. Upload your dimensioned drawings to get quantities measured off your real geometry and priced in XOF.

Are concrete prices included?

+

No, deliberately. Material prices in Guinea-Bissau move week to week and vary by region, so a price printed on a static page would be wrong within a month. This page gives you the quantity — take that to two or three local suppliers and the price will be current and competitive.

Other materials for a 150 m² house in Guinea-Bissau

Keep exploring
Advertisement