SMM7 — Standard Method of Measurement (Commonwealth practice)

Bills of Quantities for Zambia, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Zambia — using the SMM7 — Standard Method of Measurement (Commonwealth practice) standard that local quantity surveyors, contractors and lenders expect, priced in ZMW (ZK), with every rate source-cited.

Generate a Zambia BoQPriced in ZMW (ZK) · Free preview, pay 1% to unlock
Measurement standard
SMM7
Document
Bill of Quantities (BoQ)
Currency
ZMW (ZK)

What your Zambia BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in ZMW when you generate your own BoQ.

How it works in Zambia

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Zambia & ZMW
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced SMM7 bill in minutes, ready to download.

Zambia — frequently asked

What BoQ format is used in Zambia?+

Zambia uses the SMM7 — Standard Method of Measurement (Commonwealth practice) standard. Your bill is generated in that exact format, priced in ZMW.

What currency is my BoQ priced in?+

Every rate and total is priced in ZMW (ZK), the currency used in Zambia. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Zambia project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Zambia QS or contractor can check each figure. Treat it as a fast, auditable first-pass.