🇻🇳

SMM-influenced unit-price bill (Southeast Asian practice)

Bills of Quantities for Vietnam, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Vietnam — using the SMM-influenced unit-price bill (Southeast Asian practice) standard that local quantity surveyors, contractors and lenders expect, priced in VND (₫), with every rate source-cited.

Generate a Vietnam BoQPriced in VND () · Free preview, pay 1% to unlock
Measurement standard
SMM-influenced unit-price bill (Southeast Asian practice)
Document
Bill of Quantities (BoQ)
Currency
VND (₫)

What your Vietnam BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in VND when you generate your own BoQ.

How it works in Vietnam

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Vietnam & VND
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced SMM-influenced unit-price bill (Southeast Asian practice) bill in minutes, ready to download.

Vietnam — frequently asked

What BoQ format is used in Vietnam?+

Vietnam uses the SMM-influenced unit-price bill (Southeast Asian practice) standard. Your bill is generated in that exact format, priced in VND.

What currency is my BoQ priced in?+

Every rate and total is priced in VND (₫), the currency used in Vietnam. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Vietnam project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Vietnam QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Vietnam build?

Generate a Vietnam BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in VND
Related