🇻🇦

Computo Metrico Estimativo (Italian practice)

Bills of Quantities for Vatican City, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (Computo Metrico Estimativo) (Computo Metrico Estimativo) for Vatican City — using the Computo Metrico Estimativo (Italian practice) standard that local quantity surveyors, contractors and lenders expect, priced in EUR (€), with every rate source-cited.

Generate a Vatican City BoQPriced in EUR () · Free preview, pay 1% to unlock
Measurement standard
Computo Metrico Estimativo (Italian practice)
Document
Computo Metrico Estimativo
Currency
EUR (€)

What your Vatican City BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in EUR when you generate your own BoQ.

How it works in Vatican City

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Vatican City & EUR
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced Computo Metrico Estimativo (Italian practice) bill in minutes, ready to download.

Vatican City — frequently asked

What BoQ format is used in Vatican City?+

Vatican City uses the Computo Metrico Estimativo (Italian practice) standard. Your bill is generated in that exact format (locally known as the Computo Metrico Estimativo), priced in EUR.

What currency is my BoQ priced in?+

Every rate and total is priced in EUR (€), the currency used in Vatican City. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (Computo Metrico Estimativo) (Computo Metrico Estimativo) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Vatican City project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Vatican City QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Vatican City build?

Generate a Vatican City BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in EUR
Related