🇺🇿

Unit-price estimate (smeta practice, CIS/Eastern Europe)

Bills of Quantities for Uzbekistan, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) (смета) for Uzbekistan — using the Unit-price estimate (smeta practice, CIS/Eastern Europe) standard that local quantity surveyors, contractors and lenders expect, priced in UZS (лв), with every rate source-cited.

Generate a Uzbekistan BoQPriced in UZS (лв) · Free preview, pay 1% to unlock
Measurement standard
Unit-price estimate (smeta practice, CIS/Eastern Europe)
Document
смета
Currency
UZS (лв)

What your Uzbekistan BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in UZS when you generate your own BoQ.

How it works in Uzbekistan

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Uzbekistan & UZS
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced Unit-price estimate (smeta practice, CIS/Eastern Europe) bill in minutes, ready to download.

Uzbekistan — frequently asked

What BoQ format is used in Uzbekistan?+

Uzbekistan uses the Unit-price estimate (smeta practice, CIS/Eastern Europe) standard. Your bill is generated in that exact format (locally known as the смета), priced in UZS.

What currency is my BoQ priced in?+

Every rate and total is priced in UZS (лв), the currency used in Uzbekistan. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) (смета) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Uzbekistan project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Uzbekistan QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Uzbekistan build?

Generate a Uzbekistan BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in UZS
Related