🇺🇦

Unit-price estimate (smeta practice, CIS/Eastern Europe)

Bills of Quantities for Ukraine, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) (смета) for Ukraine — using the Unit-price estimate (smeta practice, CIS/Eastern Europe) standard that local quantity surveyors, contractors and lenders expect, priced in UAH (₴), with every rate source-cited.

Generate a Ukraine BoQPriced in UAH () · Free preview, pay 1% to unlock
Measurement standard
Unit-price estimate (smeta practice, CIS/Eastern Europe)
Document
смета
Currency
UAH (₴)

What your Ukraine BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in UAH when you generate your own BoQ.

How it works in Ukraine

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Ukraine & UAH
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced Unit-price estimate (smeta practice, CIS/Eastern Europe) bill in minutes, ready to download.

Ukraine — frequently asked

What BoQ format is used in Ukraine?+

Ukraine uses the Unit-price estimate (smeta practice, CIS/Eastern Europe) standard. Your bill is generated in that exact format (locally known as the смета), priced in UAH.

What currency is my BoQ priced in?+

Every rate and total is priced in UAH (₴), the currency used in Ukraine. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) (смета) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Ukraine project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Ukraine QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Ukraine build?

Generate a Ukraine BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in UAH
Related