🇺🇬

SMM for East Africa (SMM-based)

Bills of Quantities for Uganda, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Uganda — using the SMM for East Africa (SMM-based) standard that local quantity surveyors, contractors and lenders expect, priced in UGX (USh), with every rate source-cited.

Generate a Uganda BoQPriced in UGX (USh) · Free preview, pay 1% to unlock
Measurement standard
SMM for East Africa (SMM-based)
Document
Bill of Quantities (BoQ)
Currency
UGX (USh)

What your Uganda BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in UGX when you generate your own BoQ.

How it works in Uganda

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Uganda & UGX
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced SMM for East Africa (SMM-based) bill in minutes, ready to download.

Uganda — frequently asked

What BoQ format is used in Uganda?+

Uganda uses the SMM for East Africa (SMM-based) standard. Your bill is generated in that exact format, priced in UGX.

What currency is my BoQ priced in?+

Every rate and total is priced in UGX (USh), the currency used in Uganda. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Uganda project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Uganda QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Uganda build?

Generate a Uganda BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in UGX
Related