🇹🇷

Metraj ve Keşif — unit-price schedule (Türkiye)

Bills of Quantities for Turkey, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (Metraj / Keşif Özeti) (Metraj ve Keşif Özeti) for Turkey — using the Metraj ve Keşif — unit-price schedule (Türkiye) standard that local quantity surveyors, contractors and lenders expect, priced in TRY (₺), with every rate source-cited.

Generate a Turkey BoQPriced in TRY () · Free preview, pay 1% to unlock
Measurement standard
Metraj ve Keşif
Document
Metraj ve Keşif Özeti
Currency
TRY (₺)

What your Turkey BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in TRY when you generate your own BoQ.

How it works in Turkey

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Turkey & TRY
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced Metraj ve Keşif bill in minutes, ready to download.

Turkey — frequently asked

What BoQ format is used in Turkey?+

Turkey uses the Metraj ve Keşif — unit-price schedule (Türkiye) standard. Your bill is generated in that exact format (locally known as the Metraj ve Keşif Özeti), priced in TRY.

What currency is my BoQ priced in?+

Every rate and total is priced in TRY (₺), the currency used in Turkey. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (Metraj / Keşif Özeti) (Metraj ve Keşif Özeti) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Turkey project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Turkey QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Turkey build?

Generate a Turkey BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in TRY
Related