🇸🇷

STABU / NL-SfB (Netherlands)

Bills of Quantities for Suriname, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (Bestek met hoeveelheden) (Bestek met hoeveelheden) for Suriname — using the STABU / NL-SfB (Netherlands) standard that local quantity surveyors, contractors and lenders expect, priced in SRD ($), with every rate source-cited.

Generate a Suriname BoQPriced in SRD ($) · Free preview, pay 1% to unlock
Measurement standard
STABU / NL-SfB (Netherlands)
Document
Bestek met hoeveelheden
Currency
SRD ($)

What your Suriname BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in SRD when you generate your own BoQ.

How it works in Suriname

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Suriname & SRD
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced STABU / NL-SfB (Netherlands) bill in minutes, ready to download.

Suriname — frequently asked

What BoQ format is used in Suriname?+

Suriname uses the STABU / NL-SfB (Netherlands) standard. Your bill is generated in that exact format (locally known as the Bestek met hoeveelheden), priced in SRD.

What currency is my BoQ priced in?+

Every rate and total is priced in SRD ($), the currency used in Suriname. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (Bestek met hoeveelheden) (Bestek met hoeveelheden) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Suriname project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Suriname QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Suriname build?

Generate a Suriname BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in SRD
Related