🇸🇸

SMM for East Africa (SMM-based)

Bills of Quantities for South Sudan, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for South Sudan — using the SMM for East Africa (SMM-based) standard that local quantity surveyors, contractors and lenders expect, priced in SSP (£), with every rate source-cited.

Generate a South Sudan BoQPriced in SSP (£) · Free preview, pay 1% to unlock
Measurement standard
SMM for East Africa (SMM-based)
Document
Bill of Quantities (BoQ)
Currency
SSP (£)

What your South Sudan BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in SSP when you generate your own BoQ.

How it works in South Sudan

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm South Sudan & SSP
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced SMM for East Africa (SMM-based) bill in minutes, ready to download.

South Sudan — frequently asked

What BoQ format is used in South Sudan?+

South Sudan uses the SMM for East Africa (SMM-based) standard. Your bill is generated in that exact format, priced in SSP.

What currency is my BoQ priced in?+

Every rate and total is priced in SSP (£), the currency used in South Sudan. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a South Sudan project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a South Sudan QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your South Sudan build?

Generate a South Sudan BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in SSP
Related