🇸🇹

Mapa de Quantidades (Portuguese-language practice)

Bills of Quantities for São Tomé and Príncipe, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (Mapa de Quantidades) (Mapa de Quantidades / Mapa de Medições) for São Tomé and Príncipe — using the Mapa de Quantidades (Portuguese-language practice) standard that local quantity surveyors, contractors and lenders expect, priced in STN (Db), with every rate source-cited.

Generate a São Tomé and Príncipe BoQPriced in STN (Db) · Free preview, pay 1% to unlock
Measurement standard
Mapa de Quantidades (Portuguese-language practice)
Document
Mapa de Quantidades / Mapa de Medições
Currency
STN (Db)

What your São Tomé and Príncipe BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in STN when you generate your own BoQ.

How it works in São Tomé and Príncipe

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm São Tomé and Príncipe & STN
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced Mapa de Quantidades (Portuguese-language practice) bill in minutes, ready to download.

São Tomé and Príncipe — frequently asked

What BoQ format is used in São Tomé and Príncipe?+

São Tomé and Príncipe uses the Mapa de Quantidades (Portuguese-language practice) standard. Your bill is generated in that exact format (locally known as the Mapa de Quantidades / Mapa de Medições), priced in STN.

What currency is my BoQ priced in?+

Every rate and total is priced in STN (Db), the currency used in São Tomé and Príncipe. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (Mapa de Quantidades) (Mapa de Quantidades / Mapa de Medições) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a São Tomé and Príncipe project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a São Tomé and Príncipe QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your São Tomé and Príncipe build?

Generate a São Tomé and Príncipe BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in STN
Related