🇵🇷

CSI MasterFormat divisions (United States)

Bills of Quantities for Puerto Rico, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Construction Cost Estimate — Quantity Takeoff for Puerto Rico — using the CSI MasterFormat divisions (United States) standard that local quantity surveyors, contractors and lenders expect, priced in USD ($), with every rate source-cited.

Generate a Puerto Rico BoQPriced in USD ($) · Free preview, pay 1% to unlock
Measurement standard
CSI MasterFormat divisions (United States)
Document
Construction Cost Estimate — Quantity Takeoff
Currency
USD ($)

What your Puerto Rico BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in USD when you generate your own BoQ.

How it works in Puerto Rico

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Puerto Rico & USD
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced CSI MasterFormat divisions (United States) bill in minutes, ready to download.

Puerto Rico — frequently asked

What BoQ format is used in Puerto Rico?+

Puerto Rico uses the CSI MasterFormat divisions (United States) standard. Your bill is generated in that exact format, priced in USD.

What currency is my BoQ priced in?+

Every rate and total is priced in USD ($), the currency used in Puerto Rico. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Construction Cost Estimate — Quantity Takeoff costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Puerto Rico project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Puerto Rico QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Puerto Rico build?

Generate a Puerto Rico BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in USD
Related