🇵🇱

Elemental cost breakdown (European practice)

Bills of Quantities for Poland, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Poland — using the Elemental cost breakdown (European practice) standard that local quantity surveyors, contractors and lenders expect, priced in PLN (zł), with every rate source-cited.

Generate a Poland BoQPriced in PLN () · Free preview, pay 1% to unlock
Measurement standard
Elemental cost breakdown (European practice)
Document
Bill of Quantities (BoQ)
Currency
PLN (zł)

What your Poland BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in PLN when you generate your own BoQ.

How it works in Poland

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Poland & PLN
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced Elemental cost breakdown (European practice) bill in minutes, ready to download.

Poland — frequently asked

What BoQ format is used in Poland?+

Poland uses the Elemental cost breakdown (European practice) standard. Your bill is generated in that exact format, priced in PLN.

What currency is my BoQ priced in?+

Every rate and total is priced in PLN (zł), the currency used in Poland. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Poland project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Poland QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Poland build?

Generate a Poland BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in PLN
Related