🇵🇬

SMM7 — Standard Method of Measurement (Commonwealth practice)

Bills of Quantities for Papua New Guinea, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Papua New Guinea — using the SMM7 — Standard Method of Measurement (Commonwealth practice) standard that local quantity surveyors, contractors and lenders expect, priced in PGK (K), with every rate source-cited.

Generate a Papua New Guinea BoQPriced in PGK (K) · Free preview, pay 1% to unlock
Measurement standard
SMM7
Document
Bill of Quantities (BoQ)
Currency
PGK (K)

What your Papua New Guinea BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in PGK when you generate your own BoQ.

How it works in Papua New Guinea

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Papua New Guinea & PGK
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced SMM7 bill in minutes, ready to download.

Papua New Guinea — frequently asked

What BoQ format is used in Papua New Guinea?+

Papua New Guinea uses the SMM7 — Standard Method of Measurement (Commonwealth practice) standard. Your bill is generated in that exact format, priced in PGK.

What currency is my BoQ priced in?+

Every rate and total is priced in PGK (K), the currency used in Papua New Guinea. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Papua New Guinea project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Papua New Guinea QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Papua New Guinea build?

Generate a Papua New Guinea BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in PGK
Related