🇵🇦

Cómputos Métricos y Presupuesto de Obra (Latin American practice)

Bills of Quantities for Panama, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (Cómputos Métricos y Presupuesto) (Cómputos Métricos y Presupuesto de Obra) for Panama — using the Cómputos Métricos y Presupuesto de Obra (Latin American practice) standard that local quantity surveyors, contractors and lenders expect, priced in PAB (B/.), with every rate source-cited.

Generate a Panama BoQPriced in PAB (B/.) · Free preview, pay 1% to unlock
Measurement standard
Cómputos Métricos y Presupuesto de Obra (Latin American practice)
Document
Cómputos Métricos y Presupuesto de Obra
Currency
PAB (B/.)

What your Panama BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in PAB when you generate your own BoQ.

How it works in Panama

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Panama & PAB
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced Cómputos Métricos y Presupuesto de Obra (Latin American practice) bill in minutes, ready to download.

Panama — frequently asked

What BoQ format is used in Panama?+

Panama uses the Cómputos Métricos y Presupuesto de Obra (Latin American practice) standard. Your bill is generated in that exact format (locally known as the Cómputos Métricos y Presupuesto de Obra), priced in PAB.

What currency is my BoQ priced in?+

Every rate and total is priced in PAB (B/.), the currency used in Panama. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (Cómputos Métricos y Presupuesto) (Cómputos Métricos y Presupuesto de Obra) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Panama project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Panama QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Panama build?

Generate a Panama BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in PAB
Related