🇳🇬

BESMM4 — Building & Engineering Standard Method of Measurement (Nigeria)

Bills of Quantities for Nigeria, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Nigeria — using the BESMM4 — Building & Engineering Standard Method of Measurement (Nigeria) standard that local quantity surveyors, contractors and lenders expect, priced in NGN (₦), with every rate source-cited.

Generate a Nigeria BoQPriced in NGN () · Free preview, pay 1% to unlock
Measurement standard
BESMM4
Document
Bill of Quantities (BoQ)
Currency
NGN (₦)

What your Nigeria BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in NGN when you generate your own BoQ.

How it works in Nigeria

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Nigeria & NGN
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced BESMM4 bill in minutes, ready to download.

Nigeria — frequently asked

What BoQ format is used in Nigeria?+

Nigeria uses the BESMM4 — Building & Engineering Standard Method of Measurement (Nigeria) standard. Your bill is generated in that exact format, priced in NGN.

What currency is my BoQ priced in?+

Every rate and total is priced in NGN (₦), the currency used in Nigeria. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Nigeria project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Nigeria QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Nigeria build?

Generate a Nigeria BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in NGN
Related