🇳🇦

ASAQS Standard System of Measuring Building Work (Southern Africa)

Bills of Quantities for Namibia, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (BoQ) for Namibia — using the ASAQS Standard System of Measuring Building Work (Southern Africa) standard that local quantity surveyors, contractors and lenders expect, priced in NAD ($), with every rate source-cited.

Generate a Namibia BoQPriced in NAD ($) · Free preview, pay 1% to unlock
Measurement standard
ASAQS Standard System of Measuring Building Work (Southern Africa)
Document
Bill of Quantities (BoQ)
Currency
NAD ($)

What your Namibia BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in NAD when you generate your own BoQ.

How it works in Namibia

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Namibia & NAD
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced ASAQS Standard System of Measuring Building Work (Southern Africa) bill in minutes, ready to download.

Namibia — frequently asked

What BoQ format is used in Namibia?+

Namibia uses the ASAQS Standard System of Measuring Building Work (Southern Africa) standard. Your bill is generated in that exact format, priced in NAD.

What currency is my BoQ priced in?+

Every rate and total is priced in NAD ($), the currency used in Namibia. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (BoQ) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Namibia project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Namibia QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Namibia build?

Generate a Namibia BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in NAD
Related