🇲🇿

Mapa de Quantidades (Portuguese-language practice)

Bills of Quantities for Mozambique, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (Mapa de Quantidades) (Mapa de Quantidades / Mapa de Medições) for Mozambique — using the Mapa de Quantidades (Portuguese-language practice) standard that local quantity surveyors, contractors and lenders expect, priced in MZN (MT), with every rate source-cited.

Generate a Mozambique BoQPriced in MZN (MT) · Free preview, pay 1% to unlock
Measurement standard
Mapa de Quantidades (Portuguese-language practice)
Document
Mapa de Quantidades / Mapa de Medições
Currency
MZN (MT)

What your Mozambique BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in MZN when you generate your own BoQ.

How it works in Mozambique

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Mozambique & MZN
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced Mapa de Quantidades (Portuguese-language practice) bill in minutes, ready to download.

Mozambique — frequently asked

What BoQ format is used in Mozambique?+

Mozambique uses the Mapa de Quantidades (Portuguese-language practice) standard. Your bill is generated in that exact format (locally known as the Mapa de Quantidades / Mapa de Medições), priced in MZN.

What currency is my BoQ priced in?+

Every rate and total is priced in MZN (MT), the currency used in Mozambique. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (Mapa de Quantidades) (Mapa de Quantidades / Mapa de Medições) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Mozambique project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Mozambique QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Mozambique build?

Generate a Mozambique BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in MZN
Related