🇲🇷

DQE / DPGF (French practice)

Bills of Quantities for Mauritania, done in minutes

Enormous Buildings turns your dimensioned floor plans into a complete, priced Bill of Quantities (Devis Quantitatif Estimatif) (Devis Quantitatif Estimatif (DQE) / DPGF) for Mauritania — using the DQE / DPGF (French practice) standard that local quantity surveyors, contractors and lenders expect, priced in MRU (UM), with every rate source-cited.

Generate a Mauritania BoQPriced in MRU (UM) · Free preview, pay 1% to unlock
Measurement standard
DQE / DPGF (French practice)
Document
Devis Quantitatif Estimatif (DQE) / DPGF
Currency
MRU (UM)

What your Mauritania BoQ includes

Trade sections
  • Preliminaries
  • Substructure & foundations
  • Superstructure & walling
  • Roofing
  • Internal finishes
  • Services (plumbing & electrical)
  • External works
Sample measured items
DescriptionUnitQty
Foundation trench excavation22.0
Mass concrete strip foundation, C20m46.0
230mm masonry walls, common bond168.0
Reinforced concrete lintels over openingsm24.0
Roof trusses & covering142.0
Internal plaster & finishes380.0

Rates and totals are priced in MRU when you generate your own BoQ.

How it works in Mauritania

01
Upload drawings
Dimensioned floor plans as PDF, PNG or JPG.
02
Confirm Mauritania & MRU
Pick pricing tier and any specific materials.
03
Get your BoQ
Priced DQE / DPGF (French practice) bill in minutes, ready to download.

Mauritania — frequently asked

What BoQ format is used in Mauritania?+

Mauritania uses the DQE / DPGF (French practice) standard. Your bill is generated in that exact format (locally known as the Devis Quantitatif Estimatif (DQE) / DPGF), priced in MRU.

What currency is my BoQ priced in?+

Every rate and total is priced in MRU (UM), the currency used in Mauritania. You can also choose any other currency at generation.

How much does it cost?+

Generating and previewing is free. Unlocking the full Bill of Quantities (Devis Quantitatif Estimatif) (Devis Quantitatif Estimatif (DQE) / DPGF) costs 1% of the estimated building cost, paid in your own currency.

How long does it take?+

A typical analysis for a Mauritania project completes in a few minutes — versus the days or weeks a manual takeoff takes.

Can a quantity surveyor or contractor rely on it?+

The bill is grouped by trade and every unit rate carries a source, so a Mauritania QS or contractor can check each figure. Treat it as a fast, auditable first-pass.

Ready to price your Mauritania build?

Generate a Mauritania BoQ
Free to generate & preview · Pay just 1% of the building cost to unlock · Priced in MRU
Related